Skip to main content

VIDEO – demolition of UK’s M1 motorway overpass

April 17, 2015
Specialist contractor Armac recently demolished a bridge over the UK’s busy M1 motorway. The work was carried out within a tight timeframe as this important route could only be closed for a short period at night over a weekend when traffic would be at its lightest so as to minimise disruption.

Equipment was used initially to prepare the site, so as to reduce the risk to the surrounding area. Blast curtains were set in place so as to minimise the spread of debris, before the charges were activated. With the bridge then demolished by the blast, a fleet of excavators with demolition attachments was then brought in to cut up the wreckage and reduce the rubble to a manageable size, allowing it to be transported away.

Video footage has finally emerged of Armac’s spectacular bridge implosion over the M1 motorway which took place a few weeks back.

This silent movie from the 2309 Highways Agency uses time-lapse to capture the preparation and the blast before the work really starts with around with something like 10 excavators cutting up and processing the fallen bridge deck.

The “Bridge Busters” then deploy a veritable fleet of equipment to clear the site in readiness for the reopening of Junction 19.

For more information on companies in this article

Related Content

  • Australian bridge slides into position
    July 18, 2012
    A heavy rail crossing as part of Australia's EastLink motorway demanded great ingenuity and careful planning Most of the 88 bridges on the EastLink tolled motorway in, Melbourne, Australia were kept as simple and straightforward as possible. Contractor Thiess John Holland (TJH) developed its own precast yard 150km from the city, which provided many of the prefabricated materials required for the structures. This offered speed and economy while logistics and sequencing were vital for their erection. But the
  • No video provider was found to handle the given URL. See the documentation for more information.
    No video provider was found to handle the given URL. See the documentation for more information.
    VIDEO - Controlled bridge demolition over motorway
    September 15, 2016

    A UK-based demolition contractor has carried out a successful bridge demolition project over the busy M1 motorway. The specialist firm, Amac Group, used a fleet of excavators fitted with hydraulic breakers and other attachments to break up the bridge in a single overnight possession from 10th-11th September 2016. The bridge demolition is the first of two being carried out as part of the improvement works for a new link road connecting the M1 and A5 routes. The second bridge removal is planned for the 24th-25th September.

  • VIDEO: Bridge demolition jobs in CA
    November 23, 2015
    Explosive demolition techniques were used to remove a bridge structure in the US at the weekend. In California on the west coast, the removal of a pier from the old Bay Bridge structure was carried out. The explosive demolition was organised by 5246 Caltrans, with around 10tonnes of explosives being used to blast the redundant bridge pier. Protective layers of wood and steel were used to prevent debris from the massive 24.4m x 42.7m bridge pier from being thrown into the air.
  • Act FAST when it comes to bridge maintenance, argues Cliff Weston
    February 27, 2017
    Deck waterproofing remains critical to a bridge’s structural integrity for its design life, explains Cliff Weston, director of Stirling Lloyd To properly maintain deck waterproofing there must be a willingness to look at solutions based on whole-life costing rather than just short-term initial costs. There are lessons to be learned from examples of prematurely failed infrastructure due to a focus on initial short-term costs.