Skip to main content

VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting

November 3, 2016
4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.

The tunnel design is for a four-lane motorway running beside a dual-track electrified railway. The project also includes upgraded rail and motorway connections from Ringsted to Rødby in Denmark and from Puttgarden to Lübeck in Germany.

The framework on client consulting covers the periods up to and during construction and then transition to the operational phase. It also covers assistance relating to potential claims from the contractors during construction and for a period after the end of construction work.

Companies operating under the framework for technical in-house consulting services will work alongside Femern’s own technical division as an added resource.

Companies prequalified for technical in-house consulting includes 2874 CH2M HILL UK, EKJ-ILF-GEO (Denmark, Austria), Rambøll-1419 Arup-1421 TEC Joint Venture (Denmark, UK, Netherlands), WTM Engineers (Germany), 3392 Sweco Danmark, ÅF – Hansen & Henneberg (Denmark) and AF Infrastructure (Sweden).

Companies prequalified for client consulting work includes CH2M HILL UK, Rambøll-Arup-TEC Joint Venture (Denmark, UK, Netherlands), Sweco Danmark (Denmark) and ÅF Infrastructure AB (Sweden).

Work is expected to start in 2019 as the earliest, although it remains subject to approval by German authorities. Approval could come next year.

Earlier this year, the Danish government has awarded €4.4 billion worth of contracts to an international consortium that includes German Wayss und Freytag Ingenieurbau, Max Bögl Stiftung and Netherlands-based BAM. Contracts include the excavation and construction of underground tunnels, manufacture of internal tunnel elements and the entry and exit ramps.

For more information on companies in this article

Related Content

  • Fehmarn start for Germany
    December 8, 2021
    The Fehmarn Belt Fixed Link will cut journey times between Copenhagen and Hamburg.
  • More financial doubt over proposed Fehmarn Belt Tunnel
    March 17, 2017
    The proposed Fehmarn Belt Tunnel to link Denmark and northern Germany will never be economically viable, according a report commissioned by German ferry operator Scandilines. Revenue and traffic forecasts are unrealistically high, notes the report completed by German consultancy DIW Econ. It is unlikely that the latest cost to build the massive road tunnel, around €7.4 billion, would ever be recovered. The Fehmarn Belt is a strait between the German island of Fehmarn and the Danish island of Lolland. Cur
  • BAM wins motorway deals in The Hague and Munich
    December 7, 2015
    The Dutch city of The Hague has awarded a BAM joint venture with a €300 million design, construction and maintenance contract for a 4km city road. The new connecting road will run between the motorway at the Ypenburg interchange, A4 and A13, and The Hague’s Central Zone of Binckhorst-Centrum-Scheveningen. Construction will start in mid-2016 and the road is expected to be open by early 2020. The Rotterdamsebaan will make The Hague and its immediate region better accessible by connecting the A4 /A13
  • BAM half year results show jump in pre-tax profit
    August 19, 2016
    Dutch construction and related services group Royal BAM posted improved half-year results, despite Britain’s decision to leave the European Union. Half-year results to June showed pre-tax profit to €45 million, up from €4 million the previous year. However, group revenue slipped back €3.4 billion, down from around €3.5 billion. Construction and mechanical & electrical services suffered a €23.8 million loss, blamed on poor trading in Germany. But civil engineering and property helped profitability.