Skip to main content

VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting

November 3, 2016
4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.

The tunnel design is for a four-lane motorway running beside a dual-track electrified railway. The project also includes upgraded rail and motorway connections from Ringsted to Rødby in Denmark and from Puttgarden to Lübeck in Germany.

The framework on client consulting covers the periods up to and during construction and then transition to the operational phase. It also covers assistance relating to potential claims from the contractors during construction and for a period after the end of construction work.

Companies operating under the framework for technical in-house consulting services will work alongside Femern’s own technical division as an added resource.

Companies prequalified for technical in-house consulting includes 2874 CH2M HILL UK, EKJ-ILF-GEO (Denmark, Austria), Rambøll-1419 Arup-1421 TEC Joint Venture (Denmark, UK, Netherlands), WTM Engineers (Germany), 3392 Sweco Danmark, ÅF – Hansen & Henneberg (Denmark) and AF Infrastructure (Sweden).

Companies prequalified for client consulting work includes CH2M HILL UK, Rambøll-Arup-TEC Joint Venture (Denmark, UK, Netherlands), Sweco Danmark (Denmark) and ÅF Infrastructure AB (Sweden).

Work is expected to start in 2019 as the earliest, although it remains subject to approval by German authorities. Approval could come next year.

Earlier this year, the Danish government has awarded €4.4 billion worth of contracts to an international consortium that includes German Wayss und Freytag Ingenieurbau, Max Bögl Stiftung and Netherlands-based BAM. Contracts include the excavation and construction of underground tunnels, manufacture of internal tunnel elements and the entry and exit ramps.

For more information on companies in this article

Related Content

  • Fehmarn Belt Tunnel opening set for mid-2029
    August 16, 2024
    Around 1,500 tonnes of reinforcement for casting the concrete tunnel elements are produced weekly for the 17.6km Fehmarn Belt Tunnel that will connect the Danish island of Lolland with the German island of Fehmarn.
  • Permanent Fehmarnbelt element factory?
    July 7, 2023
    Sund & Bælt has completed an environmental assessment of the tunnel element factory for the 18km Fehmarnbelt project between Denmark’s Lolland and Germany’s Fehmarn islands.
  • Progress for planned Denmark-Germany immersed tunnel
    October 30, 2013
    A Danish company, Femern, is submitting documents for the Fehmarn Belt Fixed Link, an immersed tunnel that will connect Germany with Denmark. The project is expected to cost in the order of €5.5 billion to construct. An 18km immersed tunnel will link the islands of Fehmarn and Lolland. Fehmarn Island is already connected with Northern Germany’s mainland by a bridge, while Lolland is already connected by a tunnel and bridges with Zealand, a link that runs via the island of Falster
  • Further delays expected for the Fehmarn Belt Fixed Link
    August 26, 2015
    Further delays to the planned Fehmarn Belt Fixed Link between Germany and Denmark appear likely because of objections to the project during the planning stages, Danish media reported. Government authorities in the German state of Schleswig-Holstein indicated that permission for the project, which focusses on a 17km immersed road and rail tunnel, will probably be given in 2017, and not next year as previously believed. German authorities have received about 3,100 objections to the project that has rise