Skip to main content

VIDEO - Bridge demolition going wrong

June 17, 2015
A bridge demolition job went spectacularly wrong in Finland recently. Luckily for all concerned, there were no casualties, but it could have quite easily been a different story. A demolition contractor was using an excavator fitted with a hydraulic breaker to break up the structure, but the work was carrying on despite live traffic flowing on the road under the bridge.

Note too the behaviour of drivers on the route after the initial collapse.

This video came just as the European Demolition Association headed to Finland’s capital Helsinki to discuss best practice.

The Viitostiellä Mikkelissä bridge collapsed following a few blows from a hydraulic hammer to the deck, suggesting the structure was in a very poor condition indeed.

Related Content

  • Building the diamond road in Lesotho
    April 6, 2016
    A job site in the Southern African nation of Lesotho represents one of the most extreme and challenging projects to some key Italian firms of the last 10 years. The project was certainly different from the norm It involves building a road in the Lesotho Mountains, some 200km from the capital Maseru, with the work being carried out by the Cooperative of Building and Cement workers from Ravenna (CMC). CMC, which has ranked among Marini's clients for many years now, is involved in the construction of a
  • Stirling Lloyd in the fast lane: Waterproofing Warsaw’s Rowecki Bridge
    January 19, 2016
    Warsaw’s General Stefan Rowecki Bridge, or the Grota Bridge, is the second largest in the Polish capital and, as part of the Trasa Toruska expressway, it is the busiest. The structure, which opened in 1981, handles 150,000 cars daily, so repairs were always going to be tricky if minimal disruption to traffic was to occur. The steel orthotropic deck consists of two structurally independent parts – each with four traffic lanes. This meant that pedestrians and cyclists were restricted to two very narrow track
  • Learning record
    June 4, 2019
    Learning record A young driver in Germany managed to be banned from driving a mere 49 minutes after passing his test. Perhaps in jubilation at having passed the test, and no longer having to rely on his friends or ‘dad’s taxi' for transport, the 18 year-old driver inadvisedly pressed pedal to metal. Officers in the town of Hemer, near Dortmund, used a laser unit to determine the vehicle’s speed, seeing that it was travelling at 95km/h in a 50km/h zone. Perhaps he was trying to show his driving skills to hi
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w