Skip to main content

VIDEO: Bridge demolition with excavators in Chattanooga

November 23, 2015
In Chattanooga Tennessee, an overpass for the SR153 route was demolished at the weekend using a fleet of excavators fitted with hydraulic worktools. The work was carried out during an overnight possession during which traffic was halted, with the highway then able to open again in the morning. A new overpass will take the traffic in place of the old structure.

Related Content

  • New version of world’s longest floating bridge
    August 12, 2014
    The creation of a new version of the world’s longest floating bridge in Seattle, in the US state of Washington, is among the world’s most eye-catching current bridge engineering projects. It is an impressive example of the health of the bridge replacement sector, particularly in the US, leaving it well placed for growth. Guy Woodford reports Already the world’s longest floating bridge at over 2,310m long, the Governor Albert D Rosellini-Evergreen Point Floating Bridge in Seattle in the United States is g
  • Short tailswing excavator gains access
    November 29, 2012
    In Germany a short tailswing excavator from Doosan has carried out a tricky demolition project. The DX235LCR machine was used to demolish an old residential property, located in close proximity to a road. Belgian demolition contractor Klaus Anthes was brought in to carry out the work in Eppstein in Germany, and used the 24tonne excavator for the job. The work was tricky as the house was located on the side of a hill and also next to a narrow road. However traffic could not be disturbed so the machine had to
  • Gilpin Demolition gets tough with A38 overpass in Devon, UK
    December 19, 2014
    There was no need for a day shift when Devon-based Gilpin Demolition took on a timely challenge - demolish an overpass bridge in 15 hours and reopen the A38 by the following morning.

    The 40m long and 8m high single carriageway bridge, made of 1,400 tonnes of steel and concrete, was an overpass near Rattery. By 8PM the A38 below had been closed and the bridge carriageways were barricaded, ready for Gilpin’s first crew to arrive and lay down 400tonnes of stone road protection on the A38.
  • Ship Canal Bridge project in Texas restarting
    December 10, 2021
    Work is restarting in Texas for the Ship Canal Bridge project.