Skip to main content

Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided

October 23, 2015
Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.

The Canadian Broadcasting Corporation reported last June that the BC government announced the project nearly three years ago. But the CBC noted that a consultation meeting with local residents failed to address many of their concerns.

"We're basically doing the same height as the Alex Fraser [bridge], but we're also factoring in a little bit of potential sea level change because of climate change. So that distance is about 57m," said Pam Ryan, planning director of the George Massey Tunnel Replacement Project.

Some technical studies have yet to be completed before the plan is finalised, but the timetable remains intact - construction start in 2017 and completion by 2022, the CBC reported.

It is still not clear if the George Massey Tunnel, also known as the Deas Island Tunnel, under the Fraser River will be decommissioned after the new bridge is opened. The government’s project group, George Massey Tunnel Replacement Project, has said the tunnel now carries its limit of 80,000 vehicles a day.

Extensive renovations to the tunnel and attempts to improve access roads have been done over the years, buy the group says only about 10 years of life is left in the tunnel itself. A video of the tunnel being constructed in the late 1950s is %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal available here Visit Youtube video page false https://www.youtube.com/watch?v=A1igKk8eK0M false false%>.

Related Content

  • Poland: Budimex picks up S3 express road work near Lubin
    December 18, 2014
    The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,
  • Aceh Road Rehabilitation project wins key IRF GRAA award
    May 15, 2014
    The 9.1 magnitude earthquake and resulting series of tsunamis that struck Sumatra, Indonesia, in 2004 destroyed communities in 11 countries. Hardest hit was the Indonesian province of Aceh; an estimated 174,000 people were killed and 500,000 displaced. Basic infrastructure was left in ruin while the primary road along the west coast was destroyed. Vehicles making the trip had to navigate unpaved gravel roads, one-lane temporary bridges, and improvised ferries. Given the cataclysmic events that devastated th
  • Caterpillar loads up a golf course and takes it for a spin
    July 13, 2015
    Caterpillar’s recent advertising campaign lends new meaning to the term ‘driving range’. The construction equipment manufacturer loaded several heavy mining and dump trucks with soil and created a moving golf course, complete with greens and even a small waterfall. The company then had two golfers attempt to hit the “greens” as the trucks, including a 928 wheel load, drove around within driving distance of the professionals. Click here to see not just how well the golfers did underneath a clear blu
  • Czech minister Tok warns Eurovia to speed up D1 bridge repairs
    January 8, 2015
    The Czech transport minister has given construction firm Eurovia until April to start repairs on two bridges it built or face having its bank guarantees withdrawn. Transport Minister Dan Tok, who until December was the chief executive of Skanska in the Czech Republic, said he would call for a new tender for the repairs if no action is taken by Eurovia, according to a report by the Czech internet news portal iDNES. Tok said that the road bridges constructed six years ago on the D1 motorway slip road in