Skip to main content

Sumitomo paves the way

April 13, 2016

There are always road to be built and repairs to be done: with its unique JPaver patent, the Japanese firm is looking to expand into the growing paver market

Exhibitions

Related Content

  • Doka Group expands with Australian acquisition
    July 24, 2014
    The Doka Group continues to expand its operations with the acquisition of an Australian company. Called Lubeca, this firm was the former formwork technology department of its previous owner, the Australian contractor Grocon. Doka acquired the formwork patent for the Lubeca Jumpform system, along with employees and a project portfolio from Grocon. The acquisition will strengthen Doka’s presence in Australia through its new Melbourne-based subsidiary operation, as well as in the Middle East and East Asia. Dok
  • EmiControls sells four V22 dust suppression machines to Saudi Arabia quarry
    April 15, 2016
    Fresh from selling four of its V22 dust suppression machines to a big multiple quarry operator in Saudi Arabia, EmiControls is at bauma 2016 looking to expand its global distribution network. The Bolzano, Italy-based firm is seeking new distributors in America, Russia, China, France, Portugal and South America. Whilst keen to consolidate its strong market position in Europe, EmiControls is increasingly attracting strong sales interest from other regions – such as the Middle East.
  • VSS paves the way
    March 10, 2017

    VSS Macropaver has introduced its state of the art asphalt emulsion plant EP100: using a mixture of mechanical energy and chemistry it produces the asphalt emulsion used by slurry and micropaving machines on the road and takes a lot of the load off the operator

  • Caterpillar smoothens Colombian airport
    August 21, 2013
    Cartagena, Colombia’s coastal city attracts large numbers of visitors, generating heavy traffic through the Rafael Nuñez International Airport. However the surface of the runway had suffered from heavy wear, r esulting in bumpy landings and this was in need of repair. In addition, engineers wanted to create a graded, ramped approach to aid with both take-offs and landings. However, the volume of air traffic using the airport meant that construction work had to take place in a tight timeframe, between mi