Skip to main content

Peri unveils formwork developments

April 18, 2016
Peri is rolling out a range of new formwork developments. The firm has three key additions to its range that deliver new capabilities for customers.
Exhibitions

Related Content

  • Terex Washing Systems highlight new AggreSand 206 wash plant at INTERMAT 2015
    April 23, 2015
    Terex Washing Systems is here this week highlighting the successful launch of its new AggreSand 206 wash plant. Capable of handling up to 400tonnes per hour of material, the AggreSand 206 is suitable for all industrial, construction, recycling and mining applications. The first AggreSand 206 wash plant has been installed in the UK at the new Lafarge Tarmac site in Bedfordshire, England, where it is working alongside an AggreScrub 150. There are a number of other installations planned globally. “Th
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • Peri climbs high at INTERMAT 2015 with its civil engineering technology
    January 6, 2017
    Peri’s Variokit heavy-duty truss girder system has been designed specifically for tunnel and bridge construction to reach those hard-to-get places. The heavy-duty truss girder complements the Variokit heavy-duty shoring tower. Peri took into account the load-bearing capacity of the tower as well as the challenging requirements of everyday construction work.
  • Peri climbs high at INTERMAT 2015 with its civil engineering technology
    April 24, 2015
    Peri’s Variokit heavy-duty truss girder system has been designed specifically for tunnel and bridge construction to reach those hard-to-get places. The heavy-duty truss girder complements the Variokit heavy-duty shoring tower. Peri took into account the load-bearing capacity of the tower as well as the challenging requirements of everyday construction work.