Skip to main content

Montreal bridge demolished using breakers – VIDEO

October 20, 2014
A demolition contractor in Canada has carried out a successful demolition of an old bridge in Montreal. The bridge crossed the 401 highway and was removed over a weekend. Work was carried out through the night for the structure to be removed within the allotted timeframe.

Related Content

  • Demolition underway on bridge structure in Cleveland, Ohio
    June 9, 2014
    Demolition work is progressing on track on the old Innerbelt Bridge in the US city of Cleveland and spanning the Cuyahoga River. At present a demolition contractor is breaking up the structure in stages, using cutting gear and cranes to remove portions of the bridge in a phased programme of works. Once the demolition moves to a certain stage in a few months, the contractor will then be able to use explosives to demolish the remaining structure. Four of the truss bridge’s nine spans are being dismantled usi
  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Pittsburgh bridge blasted
    October 7, 2013
    Explosive demolition has been used to remove an old highway bridge in Pennsylvania. Some 90kg of explosives were used to blast the pre-weakened steel structure of the 87 year-old Masontown Bridge. The redundant steel truss structure lay just 3m from the new bridge now carrying Route 21 over the Monongahela River and connecting Masontown with Monongahela Township. The location of the explosives and the pre-weakening work carried out however meant that the old structure, built in 1925 and upgraded in 1933, fe
  • High speed bridge demolition minimises disruption
    April 13, 2012
    A high speed bridge demolition project has been carried out successfully in Germany. Speed was of the essence as the bridge spanned an important road link and had to be removed in a tight time frame, minimising disruption to traffic.