Skip to main content

Hitachi goes one step further

January 6, 2017
Hybrid-wheel loaders have never made it into production before – they’ve always been prototypes: but Hitachi has gone one step further than the rest of the construction industry, and operators could feel the benefit in lower maintenance costs and a longer product life-cycle
Exhibitions

Related Content

  • Excavator remains the key earthmoving tool
    February 17, 2012
    The excavator remains the key earthmoving tool, Mike Woof reports. The versatile hydraulic excavator has been at the heart of most earthmoving projects around the world for many years, a dominance that looks set to remain. Because of the importance to the construction sector of the excavator, manufacturers are keen to upgrade and improve their competing machines on an almost continuous basis. New technology proliferates in hydraulic excavators while firms are also focussing on increasing the range of tasks
  • Volvo CE’s 3D parts printing
    March 26, 2018
    Volvo CE says that it will utilise 3D parts printing technology to supply customers. The firm says that this will allow it to supply quality components quickly and at lower cost to customers. By using 3D parts printing the firm also says it will be able to carry out prototype testing of components more speedily than in the past. “We are supporting customers through the life cycle of their equipment,” said Jasenko Lagumdzija, anager of Business Support at Volvo CE. “It’s especially good for older machines
  • Tarmac goes low-carbon on UK’s A64
    December 20, 2024
    The trial was delivered on a 2.4km section of England’s A64 strategic highway, the eastbound carriageway at junction 44 near the town of Bramham in North Yorkshire county.
  • Hitachi EX1900-6 increases productivity at Swinden, UK quarry
    January 26, 2017
    Materials supplier Tarmac has invested in a Hitachi EX1900-6 ultra-large excavator for its Swinden Quarry in North Yorkshire, England. The EX1900-6 is used to load up to 1,200 tonnes of carboniferous limestone per hour directly into a 200tonne mobile crusher. A field conveyor takes the material to a secondary crusher at an average rate of 1,000tonnes/hour. The Hitachi model was supplied with a longer boom and arm, and a smaller 8m³ bucket, customary on a machine of this size. “This is because it needs