Skip to main content

Breakers break up bridge in US state of Mississippi

January 19, 2015
A US contractor has carried out a successful demolition job on a bridge using excavators fitted with hydraulic breakers. The fleet of 178 Caterpillar excavators used for the work managed to break up the ageing structure in just 11 hours. The old Pigeon Roost road bridge will now be replaced with another, more modern structure better able to carry the necessary traffic load. The 1500 Mississippi Department of Transportation filmed the job using time lapse techniques to show the 11 hour job condensed into just 49 stunning seconds.

For more information on companies in this article

Related Content

  • Chicago Pneumatic scores breaker supply deal in Qatar
    December 15, 2017
    Chicago Pneumatic has supplied a major order of hydraulic breakers to Rock Fall Contracting WLL (RFC), a key civil engineering and earthmoving specialist based in Doha, Qatar. The firm has augmented its fleet of Chicago Pneumatic rig-mounted hydraulic breakers with the addition of new RX8 and RX54 units. The breakers are destined for use in demanding applications within the programme of infrastructure projects for Qatar’s hosting of the IAAF World Athletics Championship in 2019 and the World Cup in 2022.
  • Volvo CE bridging the gap for new Indian transport links
    December 11, 2013
    The old Pakuria Bridge in Jharkhand, India, ran over a dry riverbed and railway line situated 20km from Calcutta. Now obsolete, the bridge has been brought to the ground in 60 days using Volvo construction equipment West Bengal in eastern India is the nation’s fourth most populous region, boasting more people than the whole of Germany. The state is bordered by Nepal, Bhutan, Bangladesh, and five other states of India with more than 91 million inhabitants spread over 34,267m².
  • VIDEO: Bridge demolition on key A90 route in Scotland
    November 4, 2015
    Demolition work has been carried out on a bridge crossing the busy A90 route in Scotland, just to the north of the capital, Edinburgh. The bridge carried the B900 over the A90 but had to be removed as its narrow design prevented the route from being upgraded to full motorway status. The first stage of the demolition work was carried out on October 24th and 25th, with the second stage on October 31st and November 1st and final remedial work to be carried out on November 14th and 15th.
  • MP300 Series multi-processors for Cat hydraulic excavators
    January 21, 2014
    Caterpillar Work Tools has introduced its new generation of Multi-Processors for Cat hydraulic excavators. Caterpillar's Multi-Processor MP300 Series (MP318 and MP324) is said to be able to handle virtually any demolition job by using the basic housing together with a choice of up to six available jaw sets. Other models will be added to the standard offering at a later stage. "We are applying technologies which reduce our customers' owning and operating costs to ensure they make more money when they choo