Skip to main content

Road Structures

Speed hardening system improves tunnel construction
February 14, 2012
BASF claims that its latest innovation will help improve efficiency in tunnel construction operations. Developed by BASF's Construction Chemicals division the new Crystal Speed Hardening system (CSH) is an advanced admixture technology aimed directly at the tunneling market.
Concrete repair solution for tunnel applications
February 14, 2012
Blastcrete Equipment Company says that its novel new Mason Mate system provides an innovative solution for concrete repair and shotcreting in tunnelling applications.
Irish bridge's CE marking
February 14, 2012
With the aid of services provided by Laidler Associates the refurbished Portumna road bridge in Galway has become the first bridge in the Ireland to carry European CE marking. The CE marking was needed because the swing bridge has moving parts, and falls within the scope of the Machinery Directive.
PERI's tall order in Mexico
February 14, 2012
The Baluarte Bridge (Puente Baluarte), part of a major highway project, ranks among the most outstanding infrastructure projects ever constructed in Mexico.
Cost-effective tunnel waterproofing
February 14, 2012
The strong market for shotcreting technology has led BASF to hold a workshop for waterproofing specialists. The firm's latest system can be used to provide a permanent waterproof single-shell tunnel lining based on sprayed concrete and double-bonded waterproofing membrane.
Queensland airport link incurs costs
February 14, 2012
In Australia contractor Leighton Holdings intends to reclaim extra costs incurred for a major airport link road project in Queensland.
Major US interchange project underway
February 14, 2012
Work is starting in the US on a US$356 million interchange project that will connect I-95, I-91 and Route 34 Interchange in New Haven.
Vietnam's new bridge deal
February 14, 2012
Funding and assistance from Australia, South Korea and the Asian Development Bank (ADB) will help finance key road and bridge projects in Vietnam.
Concrete pumps speed busy road upgrade
February 14, 2012
WORK ON a major upgrade at a busy German road junction is expected to be completed by the end of 2011. To assist in the project, two Putzmeister large-boom concrete pumps, an M 58-5 from Berger Beton and an M 62-6 from BFM Betonförderdienst in Munich, arrived at the Neufahrn motorway junction, north of the city. The junction, when viewed from above, looks like a flatly pressed four-leaf clover, and can no longer cope with traffic volumes. Two national motorways, the A 9 and the A 92, intersect at the
Innovative, flexible bridge formwork systems
February 14, 2012
Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of