Skip to main content

ULMA on the Guadiana Bridge

Heavy onsite winds and the simultaneous renovation of both pylons were challenges for ULMA when it supplied scaffolding for work on the Guadiana International Bridge
October 5, 2021 Read time: 2 mins
The 100m-high pylons of the Guadiana International Bridge were covered with ULMA’s BRIO Modular Scaffolding to facilitate the repair of suspension cables (image courtesy ULMA)

The cable-stayed structure crosses the Guadiana River to connect the Spanish town of Ayamonte and Portugal’s Vila Real de Santo António, both popular tourist destinations.

The 666m, 5-span heavily trafficked composite bridge was designed by the architects José Luis Cancio Martins and Teixeira Duarte and opened in 1991. The bridge – with a 334m central span - connects Portugal’s Via do Infante de Sagres A22 Motorway to Spain’s Autopista del Quinto Centenario A-49 Motorway and is part of the European Route E1.

Renovation work includes a major repair of suspension cables and large-scale structural and mechanical maintenance, as well as repaving of the road deck.

ULMA provisioned 460tonnes of formwork and scaffolding for the work.

The 100m-high pylons were covered with BRIO Modular Scaffolding and access stairways to creating many distinct access points to facilitate the repair of suspension cables. The scaffolding design had to accommodate the pylon geometry and the presence of the suspension cables, while providing safe working spaces. ULMA’s design was further complicated by the presence of strong winds onsite.

ULMA was required to provide an efficient and timely response to the project’s various demands, not least enough scaffolding to renovate pylons simultaneously.

Two protective gantries – one for each pylon – were installed in an extremely limited space so renovation could be undertaken without interrupting traffic flow. In order to adapt to the limited space available and withstand the load of the scaffolding structures, the gantries were made from heavy-duty T-500 Shoring Towers combined with intermediate metal beams and ENKOFORM.

See the Key project report on page 20 of this issue of World Highways for ULMA’s work on the Cebu–Cordova Link Expressway in the Philippines.

For more information on companies in this article

Related Content

  • Ulma in Poland’s S7 tunnel
    October 22, 2020
    Construction of Poland’s longest road tunnel is progressing with an MK Formwork Carriage system from Spanish manufacturer Ulma.
  • VST used on Portuguese bridge
    February 17, 2012
    PERI says that its new VST heavy-duty shoring tower serves as load-bearing scaffold for the large bridge and civil engineering projects. Each leg on the VST (VARIOKIT Shoring Tower) system can carry a load of around 600kN (the weight of about 60 VW Golf cars or one Leopard-2 tank), and the extremely flexible modular system can be assembled as segmental sections, towers or shoring tower frames for heights up to 40m.
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.