By David Arminas December 10, 2024 Read time: 2 mins
The Tubeshor ATC contains a 450-tonne hydraulic cylinder coupled to a bladder accumulator which is pressurised to suit the individual prop design geo-load before dispatch

Altrad RMD Kwikform has launched a solution to reduce the effects of thermal loading - the Tubeshor Active Thermal Compensator, ATC.

The Tubeshor hybrid hydraulic shoring system is used for propping waler beams or capping beams of large excavations. Altrad RMD Kwikform, an above and below ground temporary works specialist, said it comes in a range of diameters to cater for all duties of shoring requirement.

An evolution of Tubeshor, the ATC Tubeshor accessory can reduce thermal loading by up to 90 percent compared to a mechanically locked-off prop, explained Ian Fryer, global product innovation director at Altrad RMD Kwikform.

Prop installation and pre-loading on site is carried out in the same way as for any standard proprietary prop; no special skills required. As Tubeshor ATC units are assembled directly into the prop makeup, standard prop end-fittings such as swivel units and spherical bearers can be used. Props can be installed into the excavation in the usual manner.

The Tubeshor ATC contains a 450-tonne hydraulic cylinder coupled to a bladder accumulator which is pressurised to suit the individual prop design geo-load before dispatch. Most of the time, the pressure in the accumulator exceeds that in the hydraulic system and normal prop stiffness results.

When higher temperature forces excessive prop thermal expansion, the compressed nitrogen in the accumulator comes into play and results in a phase of reduced prop stiffness. This means that a further increase in prop length resulting from thermal expansion does not result in the usual increase in prop load.

With less space taken up within the excavation, savings can be made on equipment, labour, transport and plant cost, as smaller plant can be used to install and remove the equipment.

Loads imposed on the permanent wall from the temporary props are reduced. This enables a lower cost wall design using less material and potentially reduces the volume of excavated soil, reducing project cost and further decreasing the carbon footprint.

The prop load can be read by direct inspection on site. There is also an option to use e-pins and wireless nodes to provide continuous prop load monitoring and data logging via a smartphone, tablet or laptop.
 

For more information on companies in this article

Related Content

  • JCB's new LiveLink Lite and Dualock
    February 6, 2012
    JCB ATTACHMENTS' new innovative double locking quickhitch, featuring independent locking of the front and rear pins, has been designed for use with tracked excavators including the JS130 through to the JS460 and the wheeled JS130W to the JS200W.
  • Milling accurately for construction efficiency
    May 16, 2014
    The two-way flow of machine data is a crucial issue for machine optimisation and new telematics systems are becoming increasingly important in construction Telematics systems can be tapped into by machine control technologies to allow greater integration of the machine as a data provider within an operation. And for certain production machines that feature wear-intensive operation, telematics systems are becoming a vital tool for minimising maintenance costs by scheduling service intervals, maximising u
  • Earthmoving in advance – new technologies for shifting dirt
    February 9, 2018
    Earthmoving machine manufacturers are developing innovative new solutions for customers - Mike Woof reports. In the separate markets for excavators, wheeled loaders, graders and dozers, new models are being unveiled from several key firms. The excavator market is one of the most competitive and it is no surprise that some of the most innovative machines are being developed for this segment. Excavating One of the most significant excavator launches has been for the latest Hitachi hybrid model, which i
  • Aussie Rules for RMD Kwikform
    July 1, 2013
    RMD Kwikform has supplied the Abigroup with a full range of formwork, shoring and edge protection equipment for all 25 bridges on the Kurri Kurri to Branxton section of the Hunter Expressway in New South Wales (NSW) Australia.