Skip to main content

Aussie Rules for RMD Kwikform

RMD Kwikform has supplied the Abigroup with a full range of formwork, shoring and edge protection equipment for all 25 bridges on the Kurri Kurri to Branxton section of the Hunter Expressway in New South Wales (NSW) Australia.
July 1, 2013 Read time: 2 mins
A formwork solution from RMD Kwikform is being used on the Hunter Expressway in New South Wales, Australia
319 RMD Kwikform has supplied the 1362 Abigroup with a full range of formwork, shoring and edge protection equipment for all 25 bridges on the Kurri Kurri to Branxton section of the Hunter Expressway in New South Wales (NSW) Australia.

The Hunter Expressway is a US$1.7billion, 40km four-lane freeway link between the F3 Freeway near Seahampton, and the New England Highway, west of Branxton. Abigroup opted to utilise a range of RMD Australia equipment solutions for the bridge sections of the expressway, to minimise the footprint of clearing and disturbance while working near tracts of native vegetation, which provide habitats for threatened flora and fauna.

Of the project Mark Stanley, sales representative from RMD Australia, said: “We supplied a wide range of equipment to this large scale project, including innovative edge protection, access solutions, bridge abutment formwork, shoring systems, pier and headstock shoring and access equipment. We also included four cast in-situ voided bridge decks and four large spans of Paraslim composite bridge system for the bridge cantilevers.”

The formwork and shoring solutions developed for the cast in-situ structures along the Hunter Expressway were designed to cope with the changing circumstances at the sites structures, which initially slowed progress. RMD Australia developed the best method of forming these varying structures, which ensured the de_ ned budget and schedule for the project was achievable.

“Primarily we have supplied 400tonnes of Rapidshor, 100tonnes of Superslims and Alform Beam plus 100tonnes of Superslim and Alform Beam Headstock and solutions,” said Stanley. “The equipment has been designed around a number of intricate, complex structures, one of which utilises 60tonnes of the RMD Australia Paraslim system for a large span rail bridge.”

The Hunter Expressway is expected to significantly improve the efficiency of the national road network in Australia, providing a major new arterial route between Newcastle and the Upper Hunter Valley. Despite the challenges posed by working in areas subject to mine subsidence and acid sulphate soils, Abigroup is said to have been able to utilise the systems supplied by RMD Australia to progress on schedule.
Work on the Hunter Expressway is expected to be completed at the end of 2013.

For more information on companies in this article

Related Content

  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en
  • RMD Kwikform 3D viaduct design aids single concrete pour in Norway
    March 13, 2015
    Engineers with RMD Kwikform used 3D modelling to overcome challenging terrain and tight schedules for pouring a single-deck concrete viaduct in mid-Norway. The Doro Viaduct is a post-tension three-span single-carriageway measuring 9.5m wide. It forms an important part of the large realignment of the E39 Harangen-Høgkjølen route in the Trondheim mid-region of Norway. The project needed a formwork and shoring solution to support a 93m-long, 750m3 single-deck pour for the three span Doro viaduct in Norway. For
  • RMD Kwikform 3D viaduct design aids single concrete pour in Norway
    March 13, 2015
    Engineers with RMD Kwikform used 3D modelling to overcome challenging terrain and tight schedules for pouring a single-deck concrete viaduct in mid-Norway. The Doro Viaduct is a post-tension three-span single-carriageway measuring 9.5m wide. It forms an important part of the large realignment of the E39 Harangen-Høgkjølen route in the Trondheim mid-region of Norway. The project needed a formwork and shoring solution to support a 93m-long, 750m3 single-deck pour for the three span Doro viaduct in Norway. For
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w