Skip to main content

Trimble is developing smart construction site solutions

Trimble is taking the concept of the building information model (BIM) one stage further with its development of its construction continuum concept. This is intended to show the process and benefits to building a construction-ready model embedded with intelligent data. Such a model can serve as the basis for how contractors plan and execute construction projects. With intelligent modeling, users can add and remove information in real time while simultaneously looking at multiple ways to perform construction
January 6, 2017 Read time: 3 mins
Trimble is taking BIM one stage further
2122 Trimble is taking the concept of the building information model (BIM) one stage further with its development of its construction continuum concept. This is intended to show the process and benefits to building a construction-ready model embedded with intelligent data. Such a model can serve as the basis for how contractors plan and execute construction projects. With intelligent modeling, users can add and remove information in real time while simultaneously looking at multiple ways to perform construction work instead of making manual modifications. The ability to build construction-ready models is significant because it will enable designers and engineers to run multiple scenarios quickly and easily that accurately translate to a constructible model that contractors can effectively build against.

The construction continuum is Trimble’s vision for the construction workflow. This provides a living model with intelligent data that will serve as the foundation for how contractors plan and execute construction projects. This model is used throughout all stages of the project lifecycle, from the first stages of planning and estimating and bidding to detailed construction planning and execution. During this process, it will be continuously updated and enriched with more and more detailed information. Once the construction process is finished, the constructible model also serves as the basis for maintenance work and, eventually, for deconstruction. Through the constant information flow, it becomes a living model, a representation of the structure in the digital space.

The design phase of the continuum constructs in 3D so construction teams are delivered a construction-ready design. A constructible model is built with intelligent data that serves as the foundation of how contractors plan and execute construction projects. With intelligent modeling, users can add and remove information on the fly while looking at multiple ways to perform construction work. Building constructible models allows designers and engineers to run multiple scenarios quickly and easily that accurately translate to a constructible model that contractors can use for building.

Pairing interactive modeling with intelligent data frees engineers and architects to quickly analyse changes and design options in the physical environment. The potential impact is huge for saving time on rework, accelerating the building phase, and producing higher-quality projects.

Trimble also continues to expand its Connected Site capabilities to provide real-time information and data in the field, in the office and throughout the project. This extended capability better enables contractors to achieve faster project completion with reduced costs, improved safety and reduced environmental impact.
All videos

For more information on companies in this article

Related Content

  • Yotta develops new tools for sophisticated GIS package
    April 25, 2013
    Highway technology and services company Yotta DCL has announced new features for Horizons. The web-based platform integrates GIS, pavement and asset management for highways authorities and agencies to use in a visualised asset management system. The new version 2.3 adds features and functionality across three modules: Explorer, Analysis and Management. Explorer allows users to view, load and visualise a range of datasets, including base network data, their condition in fine detail, plus relevant asset or co
  • Work begins on Stockholm’s new bypass
    August 22, 2016
    The first tunnels are being excavated for the huge bypass tunnel in Sweden’s capital Stockholm – Adrian Greeman writes. After years of preparation and design, blasting and rock moving for Sweden's largest infrastructure project began south of the city this year. It sets in train a decade-long project that will create a new half-ring dual three-lane motorway for the city, 20km long. With most of it deep underground, it will also be one of Europe's largest ever road tunnels. The scheme is aimed at transformin
  • Laser scanning versatility
    February 13, 2012
    The upgraded ScanStation C10 laser scanning system from Leica Geosystems now offers high performance as well as increased versatility and productivity.
  • Volz: process optimisation in road construction
    November 9, 2017
    Technological advances for paving machines have greatly improved road surfaces. More advances are coming through Business Process Optimising modules, writes Stefan Volz, general manager of Volz Consulting