Skip to main content

On track with Peri’s new VCT Composite Track

By David Arminas June 19, 2025 Read time: 1 min
The VCT Composite Track system is already being used in Croatia and for construction of the new Thulba viaduct in Germany

Building steel composite bridges faster and with higher quality concrete carriageway slabs is possible with PERI’s new VCT Composite Track.

The system is already being used in Croatia and for construction of the new Thulba viaduct in Germany. Visitors will see a replica of the impressive project in the PERI exhibition hall. The composite track has also been named as a finalist for the bauma innovation award in the construction sector.

The VTC Tunnel Formwork Carriage and the SB Brace Frame facilitate shuttering and striking processes through the use of hydraulic units and can be moved automatically, which speeds up and simplifies tunnel construction processes considerably.

Peri’s portfolio for tunnel construction has been expanded to include special engineering solutions and customised special machines, which includes KERN Tunneltechnik.

For more information on companies in this article

Related Content

  • Far from formulaic
    January 6, 2017
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Far from formulaic
    January 17, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Lintec & Linnhoff’s new plans
    December 1, 2020
    Lintec & Linnhoff is unveiling its new market expansion plans after a successful business transformation
  • Major advances in asphalt paving technology
    February 9, 2012
    Using the latest paving technology has allowed contractors to carry out difficult projects Contractors in Germany and Italy have been able to carry out very difficult asphalt paving applications, using the latest machines from Vögele and Volvo Construction Equipment respectively. In both instances these projects benefited greatly from the use of the latest generation equipment and it is debatable as to whether such high quality results could have been achieved with older machines.