Skip to main content

On track with Peri’s new VCT Composite Track

By David Arminas June 19, 2025 Read time: 1 min
The VCT Composite Track system is already being used in Croatia and for construction of the new Thulba viaduct in Germany

Building steel composite bridges faster and with higher quality concrete carriageway slabs is possible with PERI’s new VCT Composite Track.

The system is already being used in Croatia and for construction of the new Thulba viaduct in Germany. Visitors will see a replica of the impressive project in the PERI exhibition hall. The composite track has also been named as a finalist for the bauma innovation award in the construction sector.

The VTC Tunnel Formwork Carriage and the SB Brace Frame facilitate shuttering and striking processes through the use of hydraulic units and can be moved automatically, which speeds up and simplifies tunnel construction processes considerably.

Peri’s portfolio for tunnel construction has been expanded to include special engineering solutions and customised special machines, which includes KERN Tunneltechnik.

For more information on companies in this article

Related Content

  • bauma Innovation Awards for six companies and research institutions
    April 11, 2016
    Six companies and research institutions have received bauma 2016 Innovation Awards. Ilse Aigner, the Bavarian minister of economics, praised the winners and all participating companies, emphasising that the awards programme “reflects the innovative strength of the construction equipment, building material and mining industries, both in Germany and internationally”. Not only does it show the things which are technically feasible, but it also gives us a glimpse of the future, she added.
  • Intermat Innovation Awards 2024: the best and brightest
    April 26, 2024
    It was an exciting evening at the Intermat 2024 Innovation Awards dinner which saw the best and the brightest showcase their products and services. It was no easy task for the judges of 9th edition of the competition, with members of the jury meeting several times to determine the nominees for the awards.
  • Bridge project uses high performing formwork
    February 20, 2012
    Doka designed and supplied a high-performing formwork technology solution for a challenging bridge project south of the German town of Halle. The 8,614m long single-cell box girder superstructure of the Saale-Elster Viaduct, with a typical cross section width of 13.9m, is borne on 220 piers, and has a constructional depth of 4m. It is mainly being erected on launching girders to minimise the impact on flora and fauna.
  • 15 leading innovations shortlisted for the Bauma awards 2013
    February 19, 2013
    Bauma has announced the shortlist for its Innovation Awards 2013, which will be presented at the show in mid April. Speaking at the event’s giant media dialog in Munich at the end of January 29, Johann Sailer, President of the VDMA Construction Machinery and Building Materials Machinery Association revealed that the organisers had received 156 entries across the scheme’s five main categories. The judges have selected three groundbreaking innovations per category to go through to the final round, and the lin