Skip to main content

On track with Peri’s new VCT Composite Track

By David Arminas June 19, 2025 Read time: 1 min
The VCT Composite Track system is already being used in Croatia and for construction of the new Thulba viaduct in Germany

Building steel composite bridges faster and with higher quality concrete carriageway slabs is possible with PERI’s new VCT Composite Track.

The system is already being used in Croatia and for construction of the new Thulba viaduct in Germany. Visitors will see a replica of the impressive project in the PERI exhibition hall. The composite track has also been named as a finalist for the bauma innovation award in the construction sector.

The VTC Tunnel Formwork Carriage and the SB Brace Frame facilitate shuttering and striking processes through the use of hydraulic units and can be moved automatically, which speeds up and simplifies tunnel construction processes considerably.

Peri’s portfolio for tunnel construction has been expanded to include special engineering solutions and customised special machines, which includes KERN Tunneltechnik.

For more information on companies in this article

Related Content

  • Machine control as a key component of digital construction
    November 22, 2017
    By means of digitalisation and modern communication technologies, building information modelling (BIM) techniques are helping to improve construction site planning, process control and operation flow on jobsites.
  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.
  • Peri targets emerging markets with new shoring system
    April 12, 2016
    Peri has developed a new lightweight version of its Variokit falsework system for emerging markets. The Alphakit system spans up to 25m, compared to 40m for its heavier sister, and can be assembled by hand until the final stages when a crane is required to lift the system into place. Still in the final stages of development, the Alphakit is not on show on Peri’s stand. However, Peri is taking customers from emerging markets to view the equipment at its factory in Germany. Like Variokit, Alphakit is aimed at
  • Bentley announces 2024 awards finalists
    August 16, 2024
    Bentley has announced its 2024 awards finalists.