Skip to main content

Toads take the high road

In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.
July 30, 2012 Read time: 1 min
In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.

Related Content

  • McLanahan launches new equipment as US election boosts sales
    March 10, 2017
    The election of president Donald Trump had an immediate and positive effect on business, according to McLanahan’s CEO Sean McLanahan, speaking at a press conference at CONEXPO-CON/AGG. “The day after the election our phones started ringing,” said McLanahan. “Projects that had been mothballed are being put back online...our sales are up significantly since that time.” Sentiment from visitors at the show so far has been equally upbeat, added the CEO.
  • VIDEO: Balfour starts M3 bridge upgrade in UK following demolition
    November 23, 2016
    Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports. Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed Balfour Beatty is working for the agency Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day.
  • Mongolia's new connections
    April 26, 2012
    Plans are in hand in Mongolia’s capital Ulaanbaatar for a series of road and bridge projects that will improve the city’s connectivity with the rest of the country. Included in the planned works are works to build five new bridges, 139km of roads and widen 150km of roads. The transport plan will run until the end of 2013. Ulaanbaatar will develop a further two bridges, rebuild 200km of roads and run 73km of roads in the period from 2013-2016. At present, there are 64 bridges and 450km of paved roads in Ulaa
  • Benin airport job for Topcon’s RD-M1 scanner
    May 13, 2022
    A $16 million runway project at Cotonou Cadjehoun Airport needed Topcon Positioning’s RD-M1 road scanner to ensure precise milling and quality resurfacing.