Skip to main content

Terex and Webasto keep rigid dump trucks hot in deepest winter

Terex Trucks has launched extreme winter protection kits for its rigid dump trucks to avoid keeping engines idling in extreme sub-zero temperatures. In its standard deliverable configuration, a Terex Trucks’ rigid hauler is designed to safely operate in conditions down to -18°C, explains Scott Pollock, product manager at Terex Trucks. But with the help of aftermarket heating specialist Webasto, this limit is greatly extended. Webasto’s Winter Kit defends trucks where temperatures fall to -25°C while the
April 10, 2017 Read time: 2 mins
Terex and Webasto take the pain out of tumbling temperatures
8081 Terex Trucks has launched extreme winter protection kits for its rigid dump trucks to avoid keeping engines idling in extreme sub-zero temperatures.

In its standard deliverable configuration, a Terex Trucks’ rigid hauler is designed to safely operate in conditions down to -18°C, explains Scott Pollock, product manager at Terex Trucks. But with the help of aftermarket heating specialist Webasto, this limit is greatly extended. Webasto’s Winter Kit defends trucks where temperatures fall to -25°C while the Arctic Kit enables safe operating up to -40°C.

General practice in colder countries is to keep engines constantly running - even during shift changes - to keep fluids warm, prevent fatigue failures in the drivetrain and seal leaks. Webasto’s truck-mounted Thermo-Heater reduces fuel consumption, engine wear-and-tear and prolonged downtime due to cold-induced mechanical issues.

Webasto say that the new technology makes use of an environment-friendly start-stop system that needs only a very small trickle of diesel. The Thermo-Heater is powered once the engine is shut down, it then draws the coolant from the engine and circulates around critical components. The engine-independent heater keeps the machine at a predetermined warmer temperature for hours after the motor is switched off, making engine restart more reliable.

Additionally, Webasto’s heater makes an operator’s life more comfortable. It supports the standard in-cab heater and there’s the added heated operator-seat.

Kits are fitted at the Motherwell factory in Scotland and are available on the TR45, TR60, TR70 and the 91tonne capacity TR100. They can be retrofitted also on older machines and are covered on the Terex Trucks protection warranty. “The newly designed kits will be offered globally,” says Pollock.

For more information on companies in this article

Related Content

  • Tougher roads
    January 2, 2013
    Designing structures and pavements to accommodate warmer weather and more extreme temperatures. On October 22nd, IRF held a notable workshop on environmental protection and the impacts of climate change in Cordoba, Argentina, in conjunction with the XVI Argentine Congress of Road Administration and Traffic. The workshop addressed a topic of key concern to transportation planning and design professionals around the world. The discussion was animated by guest panellists Professor Ram M Pendyala and Gordon Rex
  • Tougher roads
    January 22, 2013
    Designing structures and pavements to accommodate warmer weather and more extreme temperatures On October 22nd, IRF held a notable workshop on environmental protection and the impacts of climate change in Cordoba, Argentina, in conjunction with the XVI Argentine Congress of Road Administration and Traffic. The workshop addressed a topic of key concern to transportation planning and design professionals around the world. The discussion was animated by guest panellists Professor Ram M Pendyala and Gordon Rex
  • Multiple asphalt plants supply major highway construction
    July 12, 2012
    One company has produced eight asphalt plants for a major project, and others are introducing new models as Patrick Smith reports Algeria's US$11.2 billion East-West Highway development, the world's largest current highway construction project, forms part of the larger Trans-Maghreb Motorway project, and is scheduled for completion in 2010. It will run for 1,216km, ensuring the link between Annaba in the north-east and Tlemcen in the north-west, passing directly through 24 provinces and linking Algeria to T
  • Durability is crucial while warm mix technology can help disaster recovery
    February 21, 2013
    Why durability is crucial for both emerging and developed economies, and how warm mix technology can help disaster recovery - Kristina Smith reports. When CORE Construction, a 100% owned Ghanaian company, started working on road construction projects five years ago, it was difficult to source the right bituminous mixes. “In the past, most construction firms had a number of challenges when it came to bituminous works, since the local capacity was not well-developed,” said CORE CEO Frank Lartey. CORE’s soluti