Skip to main content

SmicoSymons offers new hydraulic screen media system

SmicoSymons, formed from Smico Manufacturing and Symons Screens, offers what it claims is the screening industry’s first hydraulically-operated opening and closing clamp rail system for fast change-outs of worn or broken tensioned screen media on one or more decks simultaneously. With a push of one or more buttons, clamp rails on selected decks or all decks will hydraulically open. Once replacement media is in place, one or more buttons will close and tighten the clamp rails to the specified distance from
January 6, 2017 Read time: 2 mins
7598 SmicoSymons, formed from Smico Manufacturing and Symons Screens, offers what it claims is the screening industry’s first hydraulically-operated opening and closing clamp rail system for fast change-outs of worn or broken tensioned screen media on one or more decks simultaneously.

With a push of one or more buttons, clamp rails on selected decks or all decks will hydraulically open. Once replacement media is in place, one or more buttons will close and tighten the clamp rails to the specified distance from screen box walls until they achieve the proper even tension.

According to the company, the technology reduces costly downtime to change out worn screens from an average of 8-12 hours on common size triple-deck screens to 3-4 hours and since change-outs require far fewer hours, producers can capitalise on more product flexibility from the same screen boxes.

“Screen media is expected to perform longer due to the hydraulic clamp rail system’s consistent tensioning, reducing the frequent problem of breakage with improperly manually tensioned screen media. The system may significantly reduce one of the primary causes of worker’s compensation claims, changing screen media,” says SmicoSymons.
www.Smico.com

For more information on companies in this article

Related Content

  • Allen’s diverse array of concrete machines
    January 6, 2017
    Concrete specialist Allen Engineering is highlighting it diverse product range at Conexpo, with some of its latest models on show. One of the firm’s key products is its proven Triple Roller Tube with gang vibrators, while another is the RS844 Roller Screed. Allen Engineering offers units for bridge construction and is exhibiting its versatile Bridge Deck Finisher.
  • Allen’s diverse array of concrete machines
    January 20, 2014
    Concrete specialist Allen Engineering is highlighting it diverse product range at Conexpo, with some of its latest models on show. One of the firm’s key products is its proven Triple Roller Tube with gang vibrators, while another is the RS844 Roller Screed. Allen Engineering offers units for bridge construction and is exhibiting its versatile Bridge Deck Finisher.
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Massenza’s new PMB mill increases efficiency by up to 40%
    January 6, 2017
    Massenza has redesigned its polymer modified bitumen (PMB) mill to deliver improved efficiencies of up to 40%.