Skip to main content

Smart bridge modelling tool from Autodesk

According to Autodesk, its latest Civil 3D Bridge Module allows for efficient modelling of bridges and bridge components. The package is used in conjunction with Civil 3D and or Revit as an add-on module and allows the modelling of bridges for placement based on AutoCAD Civil 3D roadway geometry and surfaces. It can be used for modelling bridge decks, piers, abutments, bearings, and barriers. It can also be used for extracting strings such as girders and barriers to create AutoCAD Civil 3D profiles. The to
April 5, 2017 Read time: 1 min
According to 685 Autodesk, its latest Civil 3D Bridge Module allows for efficient modelling of bridges and bridge components.

The package is used in conjunction with Civil 3D and or Revit as an add-on module and allows the modelling of bridges for placement based on AutoCAD Civil 3D roadway geometry and surfaces. It can be used for modelling bridge decks, piers, abutments, bearings, and barriers. It can also be used for extracting strings such as girders and barriers to create AutoCAD Civil 3D profiles.

The tool allows users to better define a bridge overpass in Civil 3D and can be used to transfer and refine the model in revit structure. It can also be used to create production drawings Back in Civil 3D.

For more information on companies in this article

Related Content

  • Efficient stockpile and site monitoring
    October 23, 2017
    Effective monitoring of aggregates stockpiles as well as face excavation can deliver greater quarrying efficiency. One of the latest innovations in quarrying is the use of drones, which provide major benefits for optimising operations. The use of affordable drone hardware and software solutions can help reduce stockpile inventory time by as much as 70%. Through the recent partnership between Trimble and Propeller, drone data can now be an everyday tool in quarries by proving a transformational impact
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • MOBA has developed advanced machine automation technology options
    January 6, 2017
    According to MOBA, its latest range of measuring and control systems suit duties with a wide array of mobile machines. The new range can be used to control quality during asphalt paving, can work on excavators and provide 3D levelling system for graders and dozers.
  • MOBA has developed advanced machine automation technology options
    February 25, 2014
    According to MOBA, its latest range of measuring and control systems suit duties with a wide array of mobile machines. The new range can be used to control quality during asphalt paving, can work on excavators and provide 3D levelling system for graders and dozers.