Skip to main content

Police unchained

In Mexico City a number of police horses en-route to assist officers at a demonstration decided they would take a break from the day’s work. The 20 animals escaped from the trailer in which they were being transported and bolted down the city’s busy streets. As if drivers in the frequently gridlocked city did not have enough to contend with, they had to watch in alarm as the horses sped past, damaging some vehicles. The horses were later caught by police with eight of the animals having suffered injuries du
December 2, 2013 Read time: 1 min
In Mexico City a number of police horses en-route to assist officers at a demonstration decided they would take a break from the day’s work. The 20 animals escaped from the trailer in which they were being transported and bolted down the city’s busy streets. As if drivers in the frequently gridlocked city did not have enough to contend with, they had to watch in alarm as the horses sped past, damaging some vehicles. The horses were later caught by police with eight of the animals having suffered injuries during their flight from the day’s duties. It has not been revealed if they will be charged with road traffic offences.

Related Content

  • Stop it with SmogStop from Envision SQ
    October 9, 2019
    Canadian company Envision SQ says that it has created a photocatalytic pollution barrier for highways that cuts NOx and VOCs in half
  • A new road project for Mexico City
    September 4, 2020
    A major new road project is being proposed for Mexico City.
  • Cifa equipment is pressed into service for Venice’s Mose project
    November 25, 2015
    The Mose project is a vast intervention plan by Italy’s Ministry of Infrastructure and Transport to protect Venice from flooding. It also has presented Cifa and its partners a big challenge for pumping concrete over a long distance. The work, being carried out by the Venezia Nuova Consortium, consisting of national and local construction and engineering companies, includes four mobile barriers consisting of 78 gates at the lagoon’s inlets. Most of the time the barriers will be resting on the seabed and not
  • Cifa equipment is pressed into service for Venice’s Mose project
    November 25, 2015
    The Mose project is a vast intervention plan by Italy’s Ministry of Infrastructure and Transport to protect Venice from flooding. It also has presented Cifa and its partners a big challenge for pumping concrete over a long distance. The work, being carried out by the Venezia Nuova Consortium, consisting of national and local construction and engineering companies, includes four mobile barriers consisting of 78 gates at the lagoon’s inlets. Most of the time the barriers will be resting on the seabed and not