Skip to main content

Pilosio flies high with Flydeck

The Flydeck system from Pilosio simplifies and speeds up the assembly of suspended scaffolding and structures more safely.Importantly, because it is an under-bridge suspended system, there is no need to stop bridge traffic or close lanes. The system consists of 25cm or 45cm aluminium or steel lattice girders connected by patented pins and spring pins.
January 17, 2023 Read time: 1 min

 

The girders are installed using the Flyrail rail. The cantilevered girders of the Flydeck surface are supported by the Flyrail rail, while the operator arranges the surface and anchors it in full safety.Loading capacity is up to 150kg/m² with tie-rods every 6m² and loading capacity up to 300kg/m² with tie-rods every 4m². The result is a perfectly horizontal plane for workers in any situation where a suspended solution is needed.

Furthermore, with the use of the Flyrail beam for mounting the Flydeck table, work can be undertaken without difficulty and in complete safety. With this solution, Pilosia says that pillars and pier-caps can be encircled and continued in the next span.

Importantly, there is no limitation in width, length or load capacity. The system is modular and uses beams and scaffolding decks of any make, model, shape and size.

For more information on companies in this article

Related Content

  • Bridge uses new forming carriage
    February 7, 2012
    The Holzmatttal Bridge for the A98 autobahn in southern Germany stretches 410m across the valley, and on this build the newly-developed Doka forming carriage TU is said to have demonstrated precisely how it drives progress with extremely short cycle times and speedy forming and stripping out operations. The underslung carriage also permits unobstructed access for site traffic.
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Winning formula for formwork
    July 19, 2012
    An unusual application of formwork took place recently in France, while formwork using one particular engineering construction kit was used for the first time in Poland. Guy Woodford reports An 80m long wild game underpass is an innovative feature of the Route Nationale 88 (RN 88) expansion in south-west France. For construction of the arched underpass tunnel, a PERI tunnel formwork carriage using VARIOKIT engineering construction kit was used. Thanks to the equipment’s easy handling, along with pre-assembl
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year