Pilosio flies high with Flydeck

The Flydeck system from Pilosio simplifies and speeds up the assembly of suspended scaffolding and structures more safely.Importantly, because it is an under-bridge suspended system, there is no need to stop bridge traffic or close lanes. The system consists of 25cm or 45cm aluminium or steel lattice girders connected by patented pins and spring pins.
January 17, 2023 Read time: 1 min

 

The girders are installed using the Flyrail rail. The cantilevered girders of the Flydeck surface are supported by the Flyrail rail, while the operator arranges the surface and anchors it in full safety.Loading capacity is up to 150kg/m² with tie-rods every 6m² and loading capacity up to 300kg/m² with tie-rods every 4m². The result is a perfectly horizontal plane for workers in any situation where a suspended solution is needed.

Furthermore, with the use of the Flyrail beam for mounting the Flydeck table, work can be undertaken without difficulty and in complete safety. With this solution, Pilosia says that pillars and pier-caps can be encircled and continued in the next span.

Importantly, there is no limitation in width, length or load capacity. The system is modular and uses beams and scaffolding decks of any make, model, shape and size.

For more information on companies in this article

Related Content

  • ULMA's complete climbing solutions
    January 1, 2018
    ULMA's complete climbing solutions is an integral package that provides forming, climbing, and safety in a single product line. We offer an integrated solution that adapts to any height and geometry, is cost-effective, and increases on-site productivity.
  • Peri formwork for Danish port link tunnel project
    November 29, 2013
    The Nordhavnsvej – Vej- og Tunnelentreprise (Nordhavnsvej) project is Copenhagen’s largest infrastructure project in the last 50 years. The 1.65km-long route will eventually link the Danish capital’s northern port area with the Helsingør motorway. It runs through a very densely built urban area, in parts at depths of up to 22m. One particular challenge regarding the execution was planning the course of the tunnel because the underground structure also crosses a very busy railway line.
  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar
  • RMD launches R800 panel girder
    July 19, 2022
    RMD Kwikform has launched its heavy-duty R800 modular panel girder system which the company says is the only CE-marked girder system on the market.