Skip to main content

Pavetest’s new thermal cracking test

Matest subsidiary Pavetest launched its new thermal stress restrained specimen test (TSRST) machine, the TSRST-Multi, at bauma. Designed for tests set down in the AASHTO TP10-93 and EN 12697-46 standards, the machine can test three specimens simultaneously inside a temperature-controlled cabinet which can vary in increments of 10 degrees between - 40 and +40 degrees C. “We decided to come up with a flexible approach where each station can test statically or dynamically. And you can have any combination,”
April 20, 2016 Read time: 2 mins
282 Matest subsidiary 7955 Pavetest launched its new thermal stress restrained specimen test (TSRST) machine, the TSRST-Multi, at bauma. Designed for tests set down in the AASHTO TP10-93 and EN 12697-46 standards, the machine can test three specimens simultaneously inside a temperature-controlled cabinet which can vary in increments of 10 degrees between - 40 and +40 degrees C.

“We decided to come up with a flexible approach where each station can test statically or dynamically. And you can have any combination,” said Pavetest MD Con Sinadinos. “It’s been in development for six months.”

Sinadinos highlighted a new approach to the design of the machine, where all the refrigeration elements are isolated within one detachable unit. This means transportation costs can be lower, because certain units are not so tall, and it makes maintenance easier, he said.

Pavetest has developed its control and data acquisition system so that eight channels rather than 16 are needed, which means that a smaller control unit can be integrated into the machine. “Normally you see a mass of wires coming out of these machines. Here they are all hidden out of the way,” said Sinadinos.
All videos

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    February 23, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges
  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • CET opens new laboratory to service UK’s infrastructure projects
    October 23, 2017
    With over £300 billion of investment in infrastructure planned over the next four years in the UK, materials testing firm CET is gearing up to service a lot more projects – Kristina Smith visited the newest laboratory near Heathrow to find out more. The CET Group has ambitious plans. Over the next four years it wants to double the size of its business, which in the last year turned over £27 million. “There’s a lot of positivity out there,” said Gary Corrigan, managing director of the group’s infrastructu
  • Alberta’s peaceful partnership
    May 4, 2020
    A bridge project in northern Canada threw up some unexpected challenges, reports David Arminas, from the banks of the Peace River in Alberta