Skip to main content

Novel drainage solution from REHAU

A novel drainage solution called the RAUSIKKO high load box system has been developed by REHAU. This system allows rainater to drain away to a separate spot rather into the localised area. The system can be used in applications with space constraints and suits duties in the parking areas and access roads around buildings. The system can be covered over with a road surface and then is strong enough to handle the passage of heavy vehicles. The idea of the system is to prevent flooding close to buildin
July 6, 2016 Read time: 2 mins
A novel drainage solution called the RAUSIKKO high load box system has been developed by REHAU.

This system allows rainater to drain away to a separate spot rather into the localised area. The system can be used in applications with space constraints and suits duties in the parking areas and access roads around buildings. The system can be covered over with a road surface and then is strong enough to handle the passage of heavy vehicles.

The idea of the system is to prevent flooding close to buildings and allowing the water to be carried away elsewhere to a point where it can be disposed of without problems. The units can be laid in a trench, lined with a geomembrane and even in the event of heavy rainfall, will allow the water to be contained and channelled safely away.

Related Content

  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Major advances in asphalt paving technology
    February 9, 2012
    Using the latest paving technology has allowed contractors to carry out difficult projects Contractors in Germany and Italy have been able to carry out very difficult asphalt paving applications, using the latest machines from Vögele and Volvo Construction Equipment respectively. In both instances these projects benefited greatly from the use of the latest generation equipment and it is debatable as to whether such high quality results could have been achieved with older machines.
  • Safety risk if construction projects speed up
    February 27, 2012
    Many governments worldwide are using investment in infrastructure as a means to help tackle the current economic conditions. New highway construction, widening and repair contracts as well as bridge and tunnel projects that had been planned, are now being accelerated to help the industry and provide construction jobs.
  • Motorway madness
    September 24, 2019
    A cyclist was recently spotted on the UK’s busy M25 motorway pedalling along the hard shoulder in the wrong direction. Police were alerted by a CCTV operator who saw the rider as he rode past a camera. Officers quickly responded and escorted the cyclist to a place of safety after providing a few words on safety. Cycling is banned on the UK’s motorways.