Skip to main content

The missing link from Vemaventuri

April 9, 2025 Read time: 1 min
TEMO Link, from Vemaventuri: concrete temperature and maturity monitoring made simpler

Vemaventuri, part of the Peri Group, has introduced into Europe the TEMO Link, a specialised version of concrete temperature and maturity monitoring.

The existing complete solution, in addition to concrete temperature and maturity monitoring, covers two additional use cases, concrete pressure monitoring and concrete detection and compaction monitoring.  

The system makes temperature and strength estimation simple, sustainable and approachable because of its straightforward installation, cost-effective setup with minimal embedded parts and focus on reusing as much material as possible.

With TEMO Link’s built-in cellular connectivity, construction teams gain real-time insights and can base their decisions on valuable information.

Link also supports various maturity functions for calibration, including the linear Nurse-Saul method (ASTM C1074) and the non-linear Arrhenius function, making it one of the most efficient and cost-effective monitoring solutions to date.

TEMO Link helps accelerate project timelines while keeping budgets on track by providing precise concrete-strength data that allows for earlier formwork striking.  

It helps to lower the risk of thermal cracking, ensuring high concrete quality in all conditions. With real-time alerts sent via the Vemaventuri web application, users stay informed about critical developments without the need for on-site visits.

Additionally, the system ensures full compliance with documentation requirements through 24/7 data tracking and reporting, making concrete monitoring more efficient and reliable than ever. 

For more information on companies in this article

Related Content

  • Innovating sustainability: The amo/Debus Gruppe and the high-tech asphalt plant in Hof, Germany
    July 29, 2025
    Founded in 1946 and headquartered in Untersiemau near Coburg, Germany, the amo/Debus Gruppe has grown into a leading force in the building materials and construction logistics industry. With more than 20 locations strategically spread across Northern Bavaria, Thuringia, and Saxony, the company has firmly established itself as a reliable partner in infrastructure development and sustainable construction.
  • Trimble is launching new machine control technology
    November 9, 2016
    Trimble is introducing a range of new technology options for customers that will boost working efficiency across a range of duties. The firm has also scored a major deal with one of China’s largest equipment manufacturers, XCMG.
  • New non-destructive testing technologies for roads and bridges
    July 11, 2018
    Two new technologies for non-destructive testing offer key benefits, one suiting road surfaces, the other suiting concrete structures - Kristina Smith reports Dynatest has developed a new way to measure and record the state of pavements, using a machine that travels at the same speed as traffic. The Rapid Pavement Tester (Raptor) has been seven years in the making and offers road owners the chance to have comprehensive surveys without the need to disrupt traffic. “People have been wanting to do this for
  • Upgrading a busy A road link in the UK
    July 4, 2018
    The upgrade to the UK’s busy A14 route will address a significant traffic bottleneck - Mike Woof writes The UK is suffering badly from traffic congestion, a problem that is particularly severe in and around its major cities. Lack of investment in road construction over many years has resulted in a major backlog of work, while the country has seen growing vehicle numbers. To make matters worse, there have been few additions to the major road network since the late 1980s and early 1990s. And the combinatio