Skip to main content

Lintec developing novel asphalt plant solutions

Highly innovative, LINTEC’s new LEP 95 system is a new, patented warm mix asphalt solution. This can be configured to produce both hot and warm mix asphalt depending on demand at the job site. A major reduction in energy consumption and emissions can be achieved by the LINTEC system working in a temperature range of 95°C-100°C. This unitcan be fitted to new or existing plants and is said to produce a smooth and stable foam for an optimum mixing result at low temperatures, while it is reliable and has low ma
March 16, 2016 Read time: 2 mins
Highly innovative, 1177 LINTEC’s new LEP 95 system is a new, patented warm mix asphalt solution. This can be configured to produce both hot and warm mix asphalt depending on demand at the job site. A major reduction in energy consumption and emissions can be achieved by the LINTEC system working in a temperature range of 95°C-100°C. This unitcan be fitted to new or existing plants and is said to produce a smooth and stable foam for an optimum mixing result at low temperatures, while it is reliable and has low maintenance needs.

LINTEC is also offering its versatile and mobile CSD 1200 asphalt plant. This can be transported easily as it comes in standard shipping containers, while also meeting tight safety requirements for operating in major markets. A key operating feature is the patented screen drum technology, which is said to reduce energy consumption by 15%. Other advantages include easy maintenance and a highly advanced control system that allows the operator to make a wide array of mixes to suit differing application requirements. As with other LINTEC plants, the basic CSD 1200 system can be extended with an array of hot storage and recycling solutions (RAP).

The firm offers a compact external hot storage silo with a capacity of 100tonnes that features two chambers, while a bigger version with four chambers has a total asphalt capacity of 270tonnes of asphalt. The compact silo can also be upgraded to 270tonnes by adding additional containers. Both versions are said to feature easy maintenance.

The company can also install its efficient asphalt burners (LAB series), with ratings from 6-24MW. High efficiency is claimed due to electronically controlled combustion, as well as low emissions and high safety standards. They are available for light oil, heavy oil and gas or fuel combinations, while single fuel burners can be retrofitted for dual fuel use.
All videos

Related Content

  • Building the diamond road in Lesotho
    April 6, 2016
    A job site in the Southern African nation of Lesotho represents one of the most extreme and challenging projects to some key Italian firms of the last 10 years. The project was certainly different from the norm It involves building a road in the Lesotho Mountains, some 200km from the capital Maseru, with the work being carried out by the Cooperative of Building and Cement workers from Ravenna (CMC). CMC, which has ranked among Marini's clients for many years now, is involved in the construction of a
  • Doosan launches 5tonne DX57W-5 stage 3B compliant wheeled excavator
    February 10, 2016
    Doosan Construction Equipment’s new 5 tonne DX57W-5 Stage IV compliant wheeled excavator complies with the latest Stage 3B emission regulations. The DX57W-5 has increased power from the 42.5kW Doosan D24 4-cylinder engine which meets Stage 3B emission regulations without the need for a diesel particulate filter (DPF), through the use of cooled exhaust gas recirculation (EGR) and diesel oxidation catalyst (DOC) after-treatment technologies. Factory tests show a 15% increase in fuel efficiency, depending
  • Doosan launches 5tonne DX57W-5 stage 3B compliant wheeled excavator
    January 6, 2017
    Doosan Construction Equipment’s new 5 tonne DX57W-5 Stage IV compliant wheeled excavator complies with the latest Stage 3B emission regulations. The DX57W-5 has increased power from the 42.5kW Doosan D24 4-cylinder engine which meets Stage 3B emission regulations without the need for a diesel particulate filter (DPF), through the use of cooled exhaust gas recirculation (EGR) and diesel oxidation catalyst (DOC) after-treatment technologies. Factory tests show a 15% increase in fuel efficiency, depending
  • Italian highway link completed
    January 24, 2017
    A challenging road construction project is being carried out in Italy within a tight timeframe, with assistance from a new Marini asphalt plant. The project is for the Salerno-Reggio Calabria highway and the work has to be completed before the end of 2016. Local contractor Bulfaro is carryiing out the work to complete surfacing work to the Macrolotto 3.2; a 40km section of the highway between Laino Borgo and Campotenese. This section of the route is at an altitude of over 800m but the work was complicated b