Skip to main content

Liebherr’s 47 M5 XXT Truck-Mounted Concrete Pump

Liebherr claims its updated 47 M5 XXT truck-mounted concrete pump offers added customer value. In-house development and optimisation of the mast is said to have been at the forefront of the latest model version. An array of other new design features will, says Liebherr, simplify the replacement of wear parts for more efficient servicing.
December 4, 2013 Read time: 3 mins
Liebherr 47 M5 XXT Truck-Mounted Concrete Pump
Liebherr claims its updated 47 M5 XXT truck-mounted concrete pump offers added customer value. In-house development and optimisation of the mast is said to have been at the forefront of the latest model version. An array of other new design features will, says Liebherr, simplify the replacement of wear parts for more efficient servicing.

The 47 M5 XXT pump’s new 47m, five-section multi-fold distributor boom is said to be extremely torsion-resistant, ensuring that vibrations are reduced to an absolute minimum when unfolding the boom on the building site. To ensure a balanced weight distribution, the concrete pipeline is configured close to the boom on both left- and right-hand sides. Minimal pressure loss over the entire length of the distributor boom is guaranteed by the pipe bend in the concrete pipeline featuring a radius of 275mm.

Moreover, the pipe bends used are predominantly of the same type, minimising required storage of various wear parts. As a whole, the compact boom package – with no overhang at the rear of the vehicle chassis – in correlation with the truck-mounted concrete pump design, lends the overall vehicle an articulate and tidily-arranged appearance.

Patent protected, and therefore said to be the only one of its kind available on the market, 718 Liebherr's XXT narrow support is low torsion and extremely robust. The front and rear outriggers are secured directly onto the boom pedestal of the distributor boom, ensuring that all forces bypass the boom completely and are channelled directly into the outriggers. Four pivoting outriggers guarantee maximum flexibility and an extremely wide swing range of the distributor boom when supporting in a narrow configuration. This can prove decisive when working on building sites with restricted access.

The truck-mounted 47 M5 XXT can be equipped with two high-pressure pump units featuring varying performance outputs. Pump unit 140HL conveys up to 140 m³/h concrete, whereas the 160HL is capable of up to 160 m³/h concrete.  Depending on respective customer requirements, the 47 M5 XXT can be arranged on a four-axle chassis from selected manufacturers, including MAN or Mercedes.

A wide range of optional accessories and equipment is available for the 47 M5 XXT. This allows the customer to opt for extra storage compartments, for example, or a second diesel tank or an additional access point on the left-hand side of the vehicle. A magnetic rotating flash provides added safety and a pneumatic pinch valve on the end hose prevents concrete spillage when repositioning the boom.

For more information on companies in this article

Related Content

  • RMD Kwikform 3D viaduct design aids single concrete pour in Norway
    March 13, 2015
    Engineers with RMD Kwikform used 3D modelling to overcome challenging terrain and tight schedules for pouring a single-deck concrete viaduct in mid-Norway. The Doro Viaduct is a post-tension three-span single-carriageway measuring 9.5m wide. It forms an important part of the large realignment of the E39 Harangen-Høgkjølen route in the Trondheim mid-region of Norway. The project needed a formwork and shoring solution to support a 93m-long, 750m3 single-deck pour for the three span Doro viaduct in Norway. For
  • RMD Kwikform 3D viaduct design aids single concrete pour in Norway
    March 13, 2015
    Engineers with RMD Kwikform used 3D modelling to overcome challenging terrain and tight schedules for pouring a single-deck concrete viaduct in mid-Norway. The Doro Viaduct is a post-tension three-span single-carriageway measuring 9.5m wide. It forms an important part of the large realignment of the E39 Harangen-Høgkjølen route in the Trondheim mid-region of Norway. The project needed a formwork and shoring solution to support a 93m-long, 750m3 single-deck pour for the three span Doro viaduct in Norway. For
  • Xylem saves operators pump admin time
    March 10, 2017
    Pump and dewatering specialist Xylem has developed its remote control and monitoring system, Godwin Field Smart Technology (FST), for use by contractors. Showcased at CONEXPO-CON/AGG, the technology can reduce the resource needed to operate and maintain pumps and provide a record of the pump’s operation.
  • Earthmoving market introductions
    February 11, 2020
    Earthmoving innovations are coming to market in the shape of new excavators and wheeled loaders