Skip to main content

Goldhofer to a Faktor of 5

Goldhofer has launched its new Faktor 5 high girder bridges. The bridges, said by the German firm to allow the transport of up to five times their own weight, come in various models with deadweights ranging from 70 to 130tonnes, making it possible to transport payloads ranging from 350 to 650tonnes. Said by Goldhofer to be comfortable with transporting extremely heavy loads such as transformers, generators, or other heavy industrial components, the new high girder bridges have a vertical stroke in the loadi
January 3, 2013 Read time: 2 mins

Goldhofer has launched its new Faktor 5 high girder bridges.

The bridges, said by the German firm to allow the transport of up to five times their own weight, come in various models with deadweights ranging from 70 to 130tonnes, making it possible to transport payloads ranging from 350 to 650tonnes.
 
Said by 1449 Goldhofer to be comfortable with transporting extremely heavy loads such as transformers, generators, or other heavy industrial components, the new high girder bridges have a vertical stroke in the loading area of 1.8m, and progressively-adjustable loading widths ranging from 3m-6.75m. These measurements make the high girder bridges flexible, with an ease of adjustment guaranteeing the greatest comfort.

Due to claimed possible loading lengths of 11m to above 17m, as well as an extremely variable axle configuration (from 2m x 12m up to 2m x 20m), Goldhofer said there are to be “practically no limits” to the transport of large, heavy loads.  Furthermore, the high girder bridges with Faktor 5 are able to guarantee easy mobilisation and economical shipping in containers.

The innovative and technically mature high girder bridges, the lateral stabilisation system from Goldhofer, the reliable hydraulics system with pressures up to 250bar, and the intelligent cross-bracing system are all said to provide the greatest possible safety during transport and the maximum protection of precious loads.

Unveiling the Faktor 5 high girder bridges, Goldhofer chief executive Stefan Fuchs said: “With the new high girder bridge Faktor 5, we have created a highly technological and innovative product that further solidifies Goldhofer’s position as the international leader in heavy transport.”

For more information on companies in this article

Related Content

  • On track with Kistler
    February 15, 2022
    How to survey and safeguard a sensitive load-bearing road above a section of railway line? This was the challenge facing Revotec, a Vienna-based bridge monitoring specialist. The solution was KiTraffic Statistics, the weigh-in-motion (WIM) system from Kistler.
  • Advanced concrete slipforming technology coming to market
    August 1, 2019
    New concrete slipforming technology is said to offer increased performance over earlier generation equipment - Mike Woof writes
  • LiuGong launches world’s first intelligent wheeled loader shovelling system
    May 20, 2019
    LiuGong has unveiled the firm’s first-ever intelligent remote-controlled shovel wheeled loader. The 886H is said by the Chinese global construction, quarrying and mining equipment giant to be a combination of intelligent remote control and intelligent technology. The model’s intelligent wheeled loader shovelling system senses material penetration; has one bottom loading and dumping; along with bucket auto levelling and controllable placement of the bucket. Intelligent shovelling enables the machine to
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.