Skip to main content

Faster patching

Ennis Prismo is introducing a new pothole reinstatement product called Repair and a novel temporary line marking system. The pothole product is said to be quick, easy and safe to use, as well as being inexpensive to purchase. This product requires little training to use and is said to be ready to carry traffic soon after installation, reducing delays and disruptions. It is also said to provide a long-lasting repair even on roads with high traffic volumes. Meanwhile the temporary line marking system is said
February 10, 2012 Read time: 1 min
1394 Ennis Prismo is introducing a new pothole reinstatement product called Repair and a novel temporary line marking system.

The pothole product is said to be quick, easy and safe to use, as well as being inexpensive to purchase. This product requires little training to use and is said to be ready to carry traffic soon after installation, reducing delays and disruptions. It is also said to provide a long-lasting repair even on roads with high traffic volumes.

Meanwhile the temporary line marking system is said to offer high retroreflectivity even in wet conditions, boosting safety at night. Called Rainline, this high visibility thermoplastic material is said to be quick to install and can be used to denote areas of temporary workings. Highly versatile, it can also be removed quickly when road repairs or alignment changes are complete.

For more information on companies in this article

Related Content

  • AIA’s UK ‘crumbling roads’ survey prompts call for greater Government funding
    March 14, 2013
    The annual national survey of UK local road network condition and funding claims there is a crumbling road crisis of increasing concern, prompting renewed calls for increased and longer term Government funding. Commissioned by the Asphalt Industry Alliance (AIA), the 18th Annual Local Authority Road Maintenance (ALARM) Survey was completed by 75% of councils across England and Wales and reports that the number of potholes filled over the last year rose to over two million - an increase of 29% on the previou
  • Easing temporary highway danger
    February 22, 2013
    Some of the latest speedometer technology has been successfully trialled in French highway work zones, while tireless work continues across Europe and the United States to reduce the number of work zone deaths and serious injuries involving road workers and motorists. Guy Woodford reports The number of roadworkers being killed and seriously injured on England’s motorways and major trunk roads more than doubled between 2007 and 2010 – from no deaths and 14 serious injuries. This rise has led to to major camp
  • Stimsonite Click Stud saves on in-situ replacement time
    April 29, 2015
    Over the past four years, there have been nine road worker deaths on the Highways Agency network in the UK. Statistics such as these are drivers for road authorities to improve health and safety for the workforce on the network. It takes just seconds to replace a Stimsonite Click Stud reflector compared to an average time of eight minutes to remove and replace a conventional bonded road stud. This greatly benefits the Highways Agency by reducing the exposure of road workers to traffic. Conventional
  • Mabey Hire supports the Whorlton Bridge
    June 10, 2025

    Whorlton Bridge in England’s County Durham has had to be closed to traffic while a major programme of works is carried out. Every component is to be removed, refurbished and replaced.

    To facilitate the works, a bespoke catenary system has been installed, with Mabey Hire’s adaptable and modular propping equipment used to construct the temporary structure.