Skip to main content

Faster patching

Ennis Prismo is introducing a new pothole reinstatement product called Repair and a novel temporary line marking system. The pothole product is said to be quick, easy and safe to use, as well as being inexpensive to purchase. This product requires little training to use and is said to be ready to carry traffic soon after installation, reducing delays and disruptions. It is also said to provide a long-lasting repair even on roads with high traffic volumes. Meanwhile the temporary line marking system is said
February 10, 2012 Read time: 1 min
1394 Ennis Prismo is introducing a new pothole reinstatement product called Repair and a novel temporary line marking system.

The pothole product is said to be quick, easy and safe to use, as well as being inexpensive to purchase. This product requires little training to use and is said to be ready to carry traffic soon after installation, reducing delays and disruptions. It is also said to provide a long-lasting repair even on roads with high traffic volumes.

Meanwhile the temporary line marking system is said to offer high retroreflectivity even in wet conditions, boosting safety at night. Called Rainline, this high visibility thermoplastic material is said to be quick to install and can be used to denote areas of temporary workings. Highly versatile, it can also be removed quickly when road repairs or alignment changes are complete.

For more information on companies in this article

Related Content

  • $220 million New Jersey - Pennsylvania bridge upgrade
    May 14, 2025
    Work is underway for a $220 million New Jersey - Pennsylvania bridge upgrade project in the US.
  • Australian bridge slides into position
    July 18, 2012
    A heavy rail crossing as part of Australia's EastLink motorway demanded great ingenuity and careful planning Most of the 88 bridges on the EastLink tolled motorway in, Melbourne, Australia were kept as simple and straightforward as possible. Contractor Thiess John Holland (TJH) developed its own precast yard 150km from the city, which provided many of the prefabricated materials required for the structures. This offered speed and economy while logistics and sequencing were vital for their erection. But the
  • Optimising investment and uptime
    February 8, 2012
    Tight deadlines, inclement weather, long travel times and inadequate tank capacity are a few of the challenges facing road marking contractors. But with the right equipment and careful planning, road marking contractors can optimise their investment and uptime, says Borum Industri. "Timing plays a key role in every road marking job. On new roads it is the last part of a project, and if there have been delays along the way, road marking contractors are under pressure to complete the job fast. On existing roa
  • Trimble’s innovation with new technology
    January 11, 2019
    Trimble is developing highly advanced technologies for the construction and quarrying sectors – Mike Woof writes Trimble is working on a number of highly innovative technologies that could revolutionise the construction and aggregates production sectors. Perhaps the most eye-catching of all of these innovations is for the autonomous compactor and dozer system Trimble is in the process of developing at present. Scott Crozier is general manager of Trimble’s general construction division. He said that whi