Skip to main content

Efficient construction management

Linarc says that it is offering a comprehensive, cloud-based construction project management software that can foster collaboration and efficiency for mid- to large- scale projects. The firm claims that its software can solve the daily challenges that owners, design teams, and contractors confront while driving projects to completion.
January 24, 2023 Read time: 2 mins
A new software system from Linarc is said to offer a comprehensive construction solution © Mikeaubry | Dreamstime.com

Linarc uses technology, integrated connectivity, intelligent data analysis, and real-time updates to give users the tools, resources, and information they need to perform at their best. As a result, projects run smoother; progress moves faster, and projects are completed on time and on budget, according to the company.

Linarc is a comprehensive project management solution that eliminates the need for multiple systems, with built-in features that provide everything a user needs to manage construction projects successfully in a single platform. In addition, Linarc is an open API and is said to integrate easily with standard project management solutions, ERPs, and other software for seamless accounting and transparency.

Linarc’s collaborative scheduling feature uses predictive analytics to allocate resources to individual tasks to eliminate delays and ensure on-time completion. It can link work crews, materials, and equipment to the schedule of values and updates progress in real-time.

The company says that project owners have clear insights into work progress and budget expenditures, while design teams are connected to project execution for problem-solving. Meanwhile, CFOs and procurement specialists have control of project financials. And management teams get detailed reports and reference dashboards to stay informed and on target. In addition, supervisors control work assignments and material deliveries for seamless workflows and sustainable progress, while field crews receive detailed work assignments with documents and photos.

Linarc can eliminate communication silos across a project portfolio, and the system’s analysis gives company leaders the leverage of combined resources across projects according to the firm.

For more information on companies in this article

Related Content

  • Traffic management software tools
    March 5, 2012
    A joint development project between Delcan Corporation and Intelligent Devices Incorporated (IDI) has resulted in the sophisticated Intelligent NETworks product. This is an integrated product that combines the IDI Intelligent Control NTCIP system with the Delcan advanced transportation applications of NETworks. The system can be linked to dynamic message signs (DMS), CCTV and vehicle detector stations (VDS), traffic intersections, as well as environment road weather sensor stations.
  • Data sharing boosts workzone safety
    March 19, 2012
    Faster and safer utilities works are the benefit of innovative data sharing moves – Mike Woof writes. Utilities works in urban areas can cause major problems with regard to traffic congestion, as well as posing key safety issues for road users and site workers. Better planning of utilities operations can help tackle congestion and prevent jams, while also ensuring that on-site personnel have a safer working environment. To ensure that site workers know the exact location of buried utilities, comprehensive m
  • New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy
    April 20, 2023
    The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.
  • Synchronised process thanks to Voegele’s WITOS Paving
    April 24, 2018
    Voegele’s WITOS Paving allows project managers to view site operation data, which helps avoid costly disruptions, the company says. The driver for WITOS is the growing trend for client and contractor to document, in real time, the progress of paving projects. WITOS does this by bringing together the different players on the project - from construction managers to asphalt plant operators and truck drivers. The system ensures greater transparency across the entire paving process. WITOS Paving, for exam