Skip to main content

Effective drainage construction with Kijlstra

Drainage products specialist drainage Kijlstra is introducing a novel push-fit drainage solution. This new jointing system allows fast assembly of drainage systems, reducing construction time. The new culverts from Kijlstra can help speed construction and civils installations and feature a novel rubber-sealed, push-fit jointing system. This is said to make installation quicker and simpler and avoids the need to apply primer and a jointing material to achieve a watertight finish, as with conventional units
October 27, 2016 Read time: 2 mins
Drainage products specialist drainage 7049 Kijlstra is introducing a novel push-fit drainage solution. This new jointing system allows fast assembly of drainage systems, reducing construction time.

The new culverts from Kijlstra can help speed construction and civils installations and feature a novel rubber-sealed, push-fit jointing system. This is said to make installation quicker and simpler and avoids the need to apply primer and a jointing material to achieve a watertight finish, as with conventional units.

The precast concrete box culverts are designed to withstand heavy road loadings and are said to combine strength with durability, with the individual sealed joints eliminating the need for any grouting on site.

Designed to BS-Eurocode guidelines BS-EN 1990/1991/1992 using Load Models LM1 and LM2 for a design life of up to 100 years, the culverts are manufactured from poured monolithic self-compacting concrete giving a high-quality finish and optimum hydraulic characteristics. The C40/50 concrete is rated to the highest sulphate resistance exposure class XA3 for use in highly aggressive chemical environments.

Available in a large range of standard sizes up to 2m, bespoke options are also offered.

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • New tunnel linings from Trelleborg
    August 2, 2017
    Trelleborg has unveiled its innovative cast-in profile sealing system at the recent 2017 Rapid Excavation & Tunnelling Conference (RETC). The firm says that its latest cast-in profile sealing systems are designed to help ensure that tunnelling projects keep to project timescales and budgets. The design of the units also helps to shorten the production process of concrete tunnel gaskets according to the firm.
  • Crushing and screening for producing and re-using
    July 23, 2012
    The recycling and minerals extraction markets now share technologies, Mike Woof reports Not surprisingly, the Steinexpo quarrying event in Germany was a key launch venue for new crushing and screening technologies, as well as associated quarrying technology. Crushing and screening equipment firms from a wide range of European countries including Austria, the Czech Republic, Germany, Ireland, Italy, Sweden, Switzerland and the UK were present at the exhibition. However it was noticeable how closely the miner
  • Road Markings to reduce fatal wrong-way driving
    October 31, 2012
    The latest road marking systems have been used to reduce potentially fatal wrong-way driving and promote the recent EURO 2012 football tournament in Poland and Ukraine. Guy Woodford reports According to statistics quoted by leading road marking firm Geveko, a total of 1,753 people were killed in the United States in wrong-way driving accidents from1996-2000. Wrong-way driving is also a significant issue across Europe and other parts of the world. Work to combat the potentially lethal activity took place re