Skip to main content

E-MAK introduces sand dryer innovation

Turkish firm E-MAK continues with its introduction of innovations for the asphalt production market with the development of its new Sandry. As the name suggests this piece of equipment is intended to dry sand before it enters the asphalt plant, helping to optimise throughput and also energy consumption, lowering production and running costs for the customer.
April 15, 2016 Read time: 2 mins
E-MAK’s new Sandry system can help reduce plant fuel bills

Turkish firm 208 E-MAK continues with its introduction of innovations for the asphalt production market with the development of its new Sandry.

As the name suggests this piece of equipment is intended to dry sand before it enters the asphalt plant, helping to optimise throughput and also energy consumption, lowering production and running costs for the customer.

The Sandry is designed to handle the 0-5mm sand fractions as these have the greatest surface area, retaining the highest moisture content and requiring separate treatment from larger grain sizes. With conventional systems, all the fractions pass through the same route from the storage hoppers to the drum, however the new Sandry ensures that the 0-5mm grain sizes take a longer route through the system, allowing the moisture to be minimised.

The 0-55mm feed material is routed into a hopper at the top of the Sandry, then is tipped in metred quantities onto the internal shelves. These tip in turn at timed intervals onto the series of shelves down the height of the Sandry’s tower. This process ensures the material is dried as the tower is kept at a constant temperature of 100°C by the two burners. And as the sand does not contain bitumen at this stage, the burners are able to operate with direct heating. The dried 0-5mm fractions then collect at the bottom of the Sandry, where they can be mixed with the 5-38mm fractions at the entrance to the mixer drum.

Because the 0-5mm fractions are preheated and have the moisture removed, this reduces the heating required in the mixer drum substantially, as well as helping to optimise material flow and allow the plant to achieve its capacity. It can be introduced into the material delivery system of most asphalt plants according to the firm.

The system has been extensively tested in the Turkish quarry belonging to the Simge Group, E-MAK’s parent company. As a result the unit is now said to be ready for the market and the firm says that this piece of equipment can help customers make substantial cuts to fuel bills.

For more information on companies in this article

Related Content

  • Benninghoven’s mixing tower meets new emissions targets
    April 20, 2016
    Benninghoven showcased the very latest in mixing plant technology at BAUMA, with the erection of a 50m-high BA4000 RPP tower at bauma. A new system for heating recycled material means that emissions are lowered, the heat of the exhaust gases is reduced which means the whole system is more efficient, and the bitumen in the recycled material is not damaged by direct contact with a flame. “This has been designed to optimise recycling,” said Benninghoven’s head of marketing Lars Henrich. “It can produce mix
  • Upgrades to existing plants with retrofits
    June 24, 2021
    Existing mix plants can be upgraded significantly by retrofitting, as has been seen by a plant upgrade for a client in Mintraching, close to Regensburg in Bavaria
  • Improved PMB plant from Massenza
    March 5, 2025

    Italian firm Massenza has carried out an extensive redesign of its PMB plant line-up. The new generation of PMB plants from the firm includes three models, the compact Smart model, the medium sized Klever and the top-of-the-range Super Klever.

  • The ART of Simex
    May 13, 2025
    Simex has released the new GEN II version of its ART 1000 patented technology for in-situ regeneration of deteriorated asphalt.