Skip to main content

Benninghoven’s mixing tower meets new emissions targets

Benninghoven showcased the very latest in mixing plant technology at BAUMA, with the erection of a 50m-high BA4000 RPP tower at bauma. A new system for heating recycled material means that emissions are lowered, the heat of the exhaust gases is reduced which means the whole system is more efficient, and the bitumen in the recycled material is not damaged by direct contact with a flame. “This has been designed to optimise recycling,” said Benninghoven’s head of marketing Lars Henrich. “It can produce mix
April 20, 2016 Read time: 2 mins

167 Benninghoven showcased the very latest in mixing plant technology at BAUMA, with the erection of a 50m-high BA4000 RPP tower at bauma.  A new system for heating recycled material means that emissions are lowered, the heat of the exhaust gases is reduced which means the whole system is more efficient, and the bitumen in the recycled material is not damaged by direct contact with a flame.

“This has been designed to optimise recycling,” said Benninghoven’s head of marketing Lars Henrich. “It can produce mixes with over 90 per cent recycled material.”

The secret to handling such a high proportion of RAP is the new heating system. The material is heated in counterflow by air from a hot gas generator. “Normally we have the burner directly in the drum. Here we use the burner to create hot gas so that the flame does not come into contact with the material,” explained Henrich.

The plant has the facility to produce hot recycled mixes and cold recycled mixes, with the cold process able to handle up to 40 per cent RAP. The ‘multi variable cold system’ provides flexibility and is useful when smaller quantities are required, said Henrich.

Every plant is bespoke, designed to suit the needs of a particular customer. Once dismantled at the end of the show, the Benninghoven plant will be heading to a road construction company in Germany. “The customer expects high production rates and the plant has to operate for 30 years, so they need the latest technology,” said Henrich.

Benninghoven expects Germany and other central European countries to be the biggest market for these 4000kg plants. New legislation in Germany relating to air quality and emissions, to be introduced in 2017, will be a driving force behind sales. To date, Benninghoven has delivered three plants, and expects demand to ramp up this year.

All videos

For more information on companies in this article

Related Content

  • Innovative asphalt plant for German contractor
    September 24, 2018
    A German contractor is now using the innovative BA RPP 4000 asphalt mixing plant from Benninghoven to boost efficiency. The firm, Max Bögl, is using the plant at its Sengenthal site, to supply material to road construction projects in the Nuremberg region. A key feature of the plant is the hot gas generator with counterflow parallel drum system, which allows high RAP content and minimal emissions. The plant supplies some 2,000tonnes/day of hot mix to job sites across the region. Depending on the formula,
  • Mixing plant and recycled asphalt innovation from Benninghoven
    March 15, 2016
    Now part of the Wirtgen Group, Benninghoven is introducing new recycled asphalt pavement (RAP) developments. The firm says that its counterflow parallel drum system with hot gas generator offers considerable benefits for RAP applications. The new design ensures that the recycled material is heated in a counterflow cycle, flowing against the heat source in the drum. The design achieves a high material temperature while lowering exhaust gas temperature. The material no longer has to be run overheated, which c
  • Upgrading a Benninghoven asphalt plant with new technology
    October 18, 2017
    Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.
  • Upgrading a Benninghoven asphalt plant with new technology
    October 18, 2017
    Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.