Doka launches Framax Xlife stripping cornet in the North America

Doka has been highlighting its new Framax Xlife stripping corner at this year’s CONEXPO-CON/AGG in Las Vegas. All the work of retracting or expanding formwork can be done fast and safely by one worker at the top of the core because of the Framax Xlife’s built-in ratchet.
March 10, 2017 Read time: 1 min
Doka’s Framax Xlife stripping corner incorporates a ratchet for easy operation

203 Doka has been highlighting its new Framax Xlife stripping corner at this year’s CONEXPO-CON/AGG in Las Vegas.

All the work of retracting or expanding formwork can be done fast and safely by one worker at the top of the core because of the Framax Xlife’s built-in ratchet.

No crane is required and the formwork unit can then be repositioned in a single lift to save crane time. With the addition of hydraulic cylinders, an operator can retract and expand the entire core formwork at the push of a button.

For more information on companies in this article

Related Content

  • Doka rises to the top
    March 13, 2017
    Framework expert Doka has launched a hydraulic stripping corner for use in high rise construction applications such as the inside of elevator cores up to 90 storeys. Framax Xlife runs off a large hydraulic unit or a cordless drill unit and does that does not require a lot of labour. Customers are keen on this idea because, it says, “no-one has a hydraulic stripping corner right now”
  • Austria's first PPP project takes shape
    July 31, 2012
    North of the Austrian capital Vienna, one of the region's biggest transport infrastructure projects for decades is currently under construction, the A5 Nordautobahn. This will give the Greater Vienna region its first-ever high-capacity link to the Czech motorway and arterial road network, greatly easing congestion on the old main road. In the first phase of construction, 22.7km of motorway are to be built. Work on the second section, all the way through to the Czech border, is to start in 2010. The A5 Norda
  • Building work
    December 18, 2017
    Formwork from Doka is playing a key role in constructing the airport’s buildings. At times as many as 80 cranes will be in use. Two-thirds of the formwork for the first construction phase are supplied by Austrian experts for formwork solutions, Doka. On this build the Doka engineers are combining in particular Timber formwork beams H20 eco and H20 top and load-bearing towers, plus Framed formwork Framax Xlife and Frami Xlife and Large-area formwork Top 50. The formwork systems from Doka are in use in many a
  • Doka delivers cantilevering for super-slim piers at Lahntal Bridge
    October 21, 2016
    Doka’s formwork expertise is currently in demand during the construction of one of the busiest motorway viaducts in Germany. The 400m six-lane Lahntal Bridge in Limburg dates from the early 1960s. Every day about 100,000 vehicles cross the bridge that spans the valley of the River Lahn. But traffic loads have increased sharply, so a new bridge is being built sited just a few metres west of the old viaduct. The new Lahntal viaduct will measure a massive 43.5m in width, enabling eight lanes plus hard shoul