Skip to main content

Deeper but safer for trench shoring solutions from ThyssenKrupp’s e+s XL Carriage

ThyssenKrupp has deepened its range of trench shoring systems with its latest e+s XL Carriage solution. The e+s XL Carriage range allows a maximum working depth of 9m for jobs needing large-scale trenches such as concrete structures, rainwater retention basins, water collectors and deep pipe-laying projects. The maximum width of the end-supported shoring system is now 18m. ThyssenKrupp says that the system works well on sites where deeper work is required and there are no space restrictions, not least be
April 24, 2018 Read time: 2 mins
ThyssenKrupp’s e+s XL carriage, an end-supported shoring system

8765 ThyssenKrupp has deepened its range of trench shoring systems with its latest e+s XL Carriage solution.

The e+s XL Carriage range allows a maximum working depth of 9m for jobs needing large-scale trenches such as concrete structures, rainwater retention basins, water collectors and deep pipe-laying projects.

The maximum width of the end-supported shoring system is now 18m.

ThyssenKrupp says that the system works well on sites where deeper work is required and there are no space restrictions, not least because of the crane assistance needed for the system members.

The carriage absorbs both compressive forces from the sides of the shoring as well as loads from the end face. Up to now, the forces have been transferred to separate components -  the carriage and shoring struts.

The advantage is that only the carriage is needed and no other components are necessary, allowing faster and more efficient installation.

The second new product in the range is a large U-type carriage car. This is used for large shoring widths of 10m in trenches that can be 6m deep or more … or where there are high loading requirements.

For more information on companies in this article

Related Content

  • Well structured maintenance
    January 4, 2013
    Major bridge maintenance and replacement projects across the world are extending the life of many impressive historic landmarks as Guy Woodford reports The Tamar Bridge, part of the main A38 trunk road linking Saltash in Cornwall with Plymouth in Devon, south west England, marked its 50th anniversary with a steel deck resurfacing project involving Stirling Lloyd's Eliminator bridge deck waterproofing system. Jointly owned by Plymouth City Council and Cornwall Council, the Tamar has a suspended length of 642
  • Trimble’s vision of a far more efficient future
    July 5, 2021
    Trimble is offering a future with more efficient, optimised construction operations for faster project delivery
  • SDS develops SuDS material to tackle highway metals pollution
    November 30, 2018
    SDS says that its engineered treatment media Aqua-Xchange can be used in regulatory-compliant sustainable drainage systems - SuDS. Delivered to site in lightweight 1m³ bags, it can be deployed as stormwater treatment in highways drainage, as well as on other higher risk locations such as retail car parks, freight and logistics hubs. SDS claims that independent tests have shown its Aqua-Xchange removes 99% of dissolved copper and zinc, toxic metals identified by Highways England as priority pollutants
  • Vögele sets paving record in German capital
    September 16, 2015
    Material transfer vehicles and remixing systems are crucial to delivering quality paving. Using material transfer vehicles (MTVs) can play a major role in delivering high quality road surfaces. These units can help boost quality by minimising the risk of material or thermal segregation. A major road paving project has been carried out in Germany using innovative paving methods. For the first time ever, binder and surface courses were paved over a width of 15.5m. This paving job was carried out on a 4.2km st