Skip to main content

Deeper but safer for trench shoring solutions from ThyssenKrupp’s e+s XL Carriage

ThyssenKrupp has deepened its range of trench shoring systems with its latest e+s XL Carriage solution. The e+s XL Carriage range allows a maximum working depth of 9m for jobs needing large-scale trenches such as concrete structures, rainwater retention basins, water collectors and deep pipe-laying projects. The maximum width of the end-supported shoring system is now 18m. ThyssenKrupp says that the system works well on sites where deeper work is required and there are no space restrictions, not least be
April 24, 2018 Read time: 2 mins
ThyssenKrupp’s e+s XL carriage, an end-supported shoring system

8765 ThyssenKrupp has deepened its range of trench shoring systems with its latest e+s XL Carriage solution.

The e+s XL Carriage range allows a maximum working depth of 9m for jobs needing large-scale trenches such as concrete structures, rainwater retention basins, water collectors and deep pipe-laying projects.

The maximum width of the end-supported shoring system is now 18m.

ThyssenKrupp says that the system works well on sites where deeper work is required and there are no space restrictions, not least because of the crane assistance needed for the system members.

The carriage absorbs both compressive forces from the sides of the shoring as well as loads from the end face. Up to now, the forces have been transferred to separate components -  the carriage and shoring struts.

The advantage is that only the carriage is needed and no other components are necessary, allowing faster and more efficient installation.

The second new product in the range is a large U-type carriage car. This is used for large shoring widths of 10m in trenches that can be 6m deep or more … or where there are high loading requirements.

For more information on companies in this article

Related Content

  • Helsinki's tunnel project
    April 11, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • Helsinki's tunnel project
    May 9, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof. A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • Trends in compaction machine technology
    February 20, 2012
    More efficient and productive compaction solutions are coming to market shortly, Mike Woof reports. Several key trends are emerging in the asphalt compaction market with the development of the latest generation machines. Performance and productivity remain key issues for compactor manufacturers with firms keen to maximise output from their latest units.
  • Poetry in motion
    August 9, 2018
    A heavy-lift operation by Roll-iT using Enerpac equipment delivered a bridge deck - with a poem engraved on the underside - to Antwerp’s old harbour Only when the deck of the new Londenbrug Bridge is raised do travellers see the poem by Antwerp poet Stijn Vranken. It is written large on the underside of the 300tonne prefabricated steel deck. People waiting for a ship to pass the raised bridge now contemplate the poem’s message about ships transporting goods and people to and from the four corners of the