Skip to main content

Born to roam, the Bison concrete batch plant from Simem

Like the wild bison of North America, this Bison from Italian manufacturer Simem can roam from place to place because it is “hyper mobile”. And when it is not roaming, it can produce up to 500 tonnes an hour, making it suitable for large civil works such as dams, airports and tunnel work.
April 14, 2016 Read time: 1 min
Born to roam: the Bison concrete batch plant from Simem
Like the wild bison of North America, this Bison from Italian manufacturer 2595 Simem can roam from place to place because it is “hyper mobile”.

And when it is not roaming, it can produce up to 500 tonnes an hour, making it suitable for large civil works such as dams, airports and tunnel work.

This trailer-mounted plant takes around four hours to install and needs no cranes, said Christopher Bennett, commercial director for UK-based HS Services – the company appointed by Simem as UK & Ireland dealer and installer for batching plant and mixers.

The main trailer consists of a twin-shaft mixer, 1-2 aggregates, powder and liquid dosing devices and loading belt. Importantly, it has a low profile - making it even more mobile for getting to sites with difficult access conditions and also for working on sites with height restrictions.

The Bison can be used with any aggregates trailer, power trailer and service trailer.

For more information on companies in this article

Related Content

  • Cifa equipment is pressed into service for Venice’s Mose project
    November 25, 2015
    The Mose project is a vast intervention plan by Italy’s Ministry of Infrastructure and Transport to protect Venice from flooding. It also has presented Cifa and its partners a big challenge for pumping concrete over a long distance. The work, being carried out by the Venezia Nuova Consortium, consisting of national and local construction and engineering companies, includes four mobile barriers consisting of 78 gates at the lagoon’s inlets. Most of the time the barriers will be resting on the seabed and not
  • Cifa equipment is pressed into service for Venice’s Mose project
    November 25, 2015
    The Mose project is a vast intervention plan by Italy’s Ministry of Infrastructure and Transport to protect Venice from flooding. It also has presented Cifa and its partners a big challenge for pumping concrete over a long distance. The work, being carried out by the Venezia Nuova Consortium, consisting of national and local construction and engineering companies, includes four mobile barriers consisting of 78 gates at the lagoon’s inlets. Most of the time the barriers will be resting on the seabed and not
  • An all-rounder from Simem
    April 18, 2016

    The Bison mobile concrete plant from Italian manufacturer Simem can roam to any site, thanks to fully hydraulic legs.

  • Increased asphalt demand - meeting the challenge
    February 8, 2012
    With demand for asphalt predicted to increase, manufacturers are ready to meet the challenge as Patrick Smith reports