Skip to main content

Benninghoven’s mixing tower meets new emissions targets

Benninghoven showcased the very latest in mixing plant technology at BAUMA, with the erection of a 50m-high BA4000 RPP tower at bauma. A new system for heating recycled material means that emissions are lowered, the heat of the exhaust gases is reduced which means the whole system is more efficient, and the bitumen in the recycled material is not damaged by direct contact with a flame. “This has been designed to optimise recycling,” said Benninghoven’s head of marketing Lars Henrich. “It can produce mix
April 20, 2016 Read time: 2 mins

167 Benninghoven showcased the very latest in mixing plant technology at BAUMA, with the erection of a 50m-high BA4000 RPP tower at bauma.  A new system for heating recycled material means that emissions are lowered, the heat of the exhaust gases is reduced which means the whole system is more efficient, and the bitumen in the recycled material is not damaged by direct contact with a flame.

“This has been designed to optimise recycling,” said Benninghoven’s head of marketing Lars Henrich. “It can produce mixes with over 90 per cent recycled material.”

The secret to handling such a high proportion of RAP is the new heating system. The material is heated in counterflow by air from a hot gas generator. “Normally we have the burner directly in the drum. Here we use the burner to create hot gas so that the flame does not come into contact with the material,” explained Henrich.

The plant has the facility to produce hot recycled mixes and cold recycled mixes, with the cold process able to handle up to 40 per cent RAP. The ‘multi variable cold system’ provides flexibility and is useful when smaller quantities are required, said Henrich.

Every plant is bespoke, designed to suit the needs of a particular customer. Once dismantled at the end of the show, the Benninghoven plant will be heading to a road construction company in Germany. “The customer expects high production rates and the plant has to operate for 30 years, so they need the latest technology,” said Henrich.

Benninghoven expects Germany and other central European countries to be the biggest market for these 4000kg plants. New legislation in Germany relating to air quality and emissions, to be introduced in 2017, will be a driving force behind sales. To date, Benninghoven has delivered three plants, and expects demand to ramp up this year.

All videos

For more information on companies in this article

Related Content

  • Bitumen technology specialists work to lower embodied carbon
    April 5, 2021
    A novel recipe for bitumen combines chemicals extracted from naturally occurring asphalt with a product created from cashew nut shells. Called ‘Instant Asphalt’, the idea is the brainchild of Frank Albrecht, managing of Albrecht Supply Concepts, which specialises in bitumen engineering.
  • Doka pushes into Asia and Middle East with load bearing tower d3
    February 10, 2016
    With the Load-bearing tower d3, Doka is expanding its product portfolio for Southeast Asia and the Middle East. Load-bearing tower d3 is a product enhancement of a successful Doka load-bearing system and combines the benefits of existing systems. The d3 is designed for particularly tall shoring heights and high loads. Applications are in building construction as well as civil and industrial construction. It is not required to dismantle and reassemble the shoring towers for repositioning and manual reposi
  • Doka pushes into Asia and Middle East with load bearing tower d3
    January 6, 2017
    With the Load-bearing tower d3, Doka is expanding its product portfolio for Southeast Asia and the Middle East. Load-bearing tower d3 is a product enhancement of a successful Doka load-bearing system and combines the benefits of existing systems. The d3 is designed for particularly tall shoring heights and high loads. Applications are in building construction as well as civil and industrial construction. It is not required to dismantle and reassemble the shoring towers for repositioning and manual reposi
  • Cummins ditches cooled EGR on its latest QSM12
    January 6, 2017
    Cummins has taken a major leap forward with engine design as it ditches cooled exhaust gas recirculation for its newest heavy-duty six-cylinder engine platform launched at bauma – the 12-litre QSM12. As its Tier 4 Final/Stage 4 engine solution in the 250-383kW sector, the QSM12 benefits from higher efficiency air handling and an advanced in-cylinder combustion process, allowing a return to using a straightforward wastegated turbocharger.