Skip to main content

Benninghoven’s mixing tower meets new emissions targets

Benninghoven showcased the very latest in mixing plant technology at BAUMA, with the erection of a 50m-high BA4000 RPP tower at bauma. A new system for heating recycled material means that emissions are lowered, the heat of the exhaust gases is reduced which means the whole system is more efficient, and the bitumen in the recycled material is not damaged by direct contact with a flame. “This has been designed to optimise recycling,” said Benninghoven’s head of marketing Lars Henrich. “It can produce mix
April 20, 2016 Read time: 2 mins

167 Benninghoven showcased the very latest in mixing plant technology at BAUMA, with the erection of a 50m-high BA4000 RPP tower at bauma.  A new system for heating recycled material means that emissions are lowered, the heat of the exhaust gases is reduced which means the whole system is more efficient, and the bitumen in the recycled material is not damaged by direct contact with a flame.

“This has been designed to optimise recycling,” said Benninghoven’s head of marketing Lars Henrich. “It can produce mixes with over 90 per cent recycled material.”

The secret to handling such a high proportion of RAP is the new heating system. The material is heated in counterflow by air from a hot gas generator. “Normally we have the burner directly in the drum. Here we use the burner to create hot gas so that the flame does not come into contact with the material,” explained Henrich.

The plant has the facility to produce hot recycled mixes and cold recycled mixes, with the cold process able to handle up to 40 per cent RAP. The ‘multi variable cold system’ provides flexibility and is useful when smaller quantities are required, said Henrich.

Every plant is bespoke, designed to suit the needs of a particular customer. Once dismantled at the end of the show, the Benninghoven plant will be heading to a road construction company in Germany. “The customer expects high production rates and the plant has to operate for 30 years, so they need the latest technology,” said Henrich.

Benninghoven expects Germany and other central European countries to be the biggest market for these 4000kg plants. New legislation in Germany relating to air quality and emissions, to be introduced in 2017, will be a driving force behind sales. To date, Benninghoven has delivered three plants, and expects demand to ramp up this year.

All videos

For more information on companies in this article

Related Content

  • Cummins ditches cooled EGR on its latest QSM12
    April 15, 2013
    Cummins has taken a major leap forward with engine design as it ditches cooled exhaust gas recirculation for its newest heavy-duty six-cylinder engine platform launched at bauma – the 12-litre QSM12. As its Tier 4 Final/Stage 4 engine solution in the 250-383kW sector, the QSM12 benefits from higher efficiency air handling and an advanced in-cylinder combustion process, allowing a return to using a straightforward wastegated turbocharger.
  • Developments in noise-reducing road surfaces
    February 17, 2012
    Mixtures with special additives are being produced for roads, offering noise reduction and aiding recycling. Patrick Smith reports. Noise-reducing road surfacings have been used in motorway construction for some time. But relatively new are noise-optimised surfacings used on roads in towns that do not follow a standard concept.Road trials with these materials have taken place in Germany since 2007 and have been prioritised due to the European Union Guidelines on the Assessment and Management of Environmenta
  • Turkish bitumen innovation – from E-MAK
    September 13, 2016
    Turkish firm E-MAK has a reputation for delivering innovative solutions to the industry, with its presence at the bauma exhibition in Munich providing further proof. The firm’s two latest bitumen storage developments could cut costs for plant operators substantially. The new Bi SAS 300 system from E-MAK is intended to cut the cost of bitumen storage by lowering heating bills. According to E-MAK’s chairman, S Nezir Gencer, the operators of most asphalt plants tend to focus on how much fuel the burners used t
  • Ammann asphalt plant supplies material in China
    May 16, 2018
    An Ammann asphalt plant has been used to supply material for a landmark project in China. The Ammann ABP 320 Universal Asphalt-Mixing Plant played an important role in carrying out preparation work for the high-profile BRICS Summit held recently in China