Skip to main content

WestConnex to provide vital Sydney Airport link

The 33km WestConnex project will link the M4 to Sydney Airport, Port Botany and the M5 East in New South Wales, Australia. The project aims to improve King Georges Road, which will join the new M5 east with a dedicated lane of its own. The works will receive US$1.87 billion (AUD 1.80bn) up front from the state government.
April 3, 2013 Read time: 1 min
The 33km WestConnex project will link the M4 to Sydney Airport, Port Botany and the M5 East in New South Wales, Australia. The project aims to improve King Georges Road, which will join the new M5 east with a dedicated lane of its own. The works will receive US$1.87 billion (AUD 1.80bn) up front from the state government.

Related Content

  • Go-ahead given for Sydney’s US$10.92bn Westconnex motorway
    September 19, 2013
    New South Wales Premier Barry O'Farrell has given the go-ahead for the US$10.92 billion (AUD 11.5 billion) Westconnex motorway project in Sydney, Australia. A total of $1.4 billion (AUD 1.5 billion) has been pledged by Prime Minister Tony Abbott over four years, while $1.68 billion (AUD 1.8 billion) has been committed by the state government. The private sector will channel the remaining fund through tolls. A toll for using the 33km motorway will be reportedly capped at $7.21 (AUD 7.70). With its constru
  • New design for Sydney’s WestConnex motorway project third stage
    November 14, 2016
    Sydney’s proposed WestConnex motorway will be wider than planned to accommodate four instead of three lanes in each direction, according to media reports. The changes are part of a revamp of the third and final stage of the ambitious project in the capital city of Australia’s eastern New South Wales state. Some exit and entry ramps will also be scrapped but the overall cost of just under US$5.3 billion for the third stage remains unchanged, reported the Sydney Morning Herald newspaper. The projects
  • New South Wales backpedals over WestConnex cycling bridge
    April 30, 2019
    Controversy has again hit Australia’s WestConnex project in Sydney with media reports the a planned cycle and pedestrian bridge is to be axed. In its place will be a new raised flyover running through the residential and parkland area, according to a report in The Age newspaper. The Pedestrian and Cycling Green Link was part of the original planning permission for the US$11.85 billion WestConnex project and was to rise above parts of the surface motorway in Rozelle and Lilyfield neighbourhoods. The
  • Tunnel, M4 motorway widening first stage of WestConnex motorway
    August 23, 2013
    A 4km tunnel and the widening of the M4 motorway will be the first works on the WestConnex motorway project in Sydney, Australia. The initial works will cost between US$2.72 billion (AUD 3 billion) and $3.6 billion (AUD 4 billion). The tunnel will run from Strathfield to Ashfield and will run under the Parramatta Road. The government has pledged $1.62 billion (AUD 1.8 billion) to the project. Announced in October 2012, the completed 33km WestConnex motorway will cover the western, inner western, and sout