Skip to main content

Vietnam sets highway plan of action

Additional funding is being sought for the third stage of a project that will upgrade the 3,010km Ho Chi Minh Highway in Vietnam. The third phase of the project has an estimated investment capital of some US$14.7 billion and foreign and local investors are being invited to invest in the road through different funding structures. The funding models will include the proven build-transfer-operate (BTO), build-transfer (BT) and build-operate-transfer (BOT) systems, with from 20%-30% of the funding to come from
May 28, 2012 Read time: 2 mins
RSSAdditional funding is being sought for the third stage of a project that will upgrade the 3,010km Ho Chi Minh Highway in Vietnam.

The third phase of the project has an estimated investment capital of some US$14.7 billion and foreign and local investors are being invited to invest in the road through different funding structures.

The funding models will include the proven build-transfer-operate (BTO), build-transfer (BT) and build-operate-transfer (BOT) systems, with from 20%-30% of the funding to come from Vietnam's State budget.

Planned highway sections include the 282km Khe Co-Cam Lo stretch and the 322km Cho Ben-Khe Co section and these will be developed starting 2025. Other planned sections include 102km Cay Chanh-Chon Thanh stretch, the 63km Chon Thanh-Binh Phuoc stretch and intersection and a 160.4km section for Chon Thanh-Duc Hoa-My An. These are planned for the 2020-2025.

Meanwhile the 143km Binh Ca-Son Tay-Cho Ben section and 392km Tum-Gia Lai-Dak Lak-Dac Nong section will be developed between 2015 and 2020. Three four-lane highway road sections include the 182km Cam Lo-Tuy Loan, the 53.4km Lo Te-Rach Soi stretch and the 76km My An-Lo Te section, which will be developed from now until 2015.

Related Content

  • Hanoi-Can Tho expressway in Vietnam bond financing evaluation
    April 30, 2013
    The capital planning for the major expansion and upgrading of Hanoi-Can Tho expressway in Vietnam is being considered ahead of a National Assembly evaluation for bond financing. The Ministry of Transport (MoT) has made a proposal for the prime minister to seek the National Assembly's permission to issue government bonds to handle the project. Last month, the MoT presented Document 2738/BGTVT-KHDT to the prime minister to seek capital resources for 17 road sections under the project. The government bonds wil
  • Myanmar’s international connections with neighbours
    April 6, 2018
    A major road development will be the establishment of a new link connecting Myanmar with other countries in South East Asia. The new highway will allow drivers to travel from Myanmar to Thailand as well as Vietnam and Cambodia. A loan worth US$144.3 million from Thailand will help pay for the section of the route in Myanmar between Dawei and Hteekee. Once complete the highway will connect Ho Chi Minh City in Vietnam with Siem Reap and Phnom Penh in Cambodia and Kanchanaburi and Bangkok in Thailand. Called
  • Slovakia highway opening faces delays
    March 2, 2017
    A key stretch of the D3 highway in Slovakia will open in the third quarter of 2017. This timescale represents a delay however as the section of road was originally planned to open in the second quarter of 2017. The 4.25km section runs from Zilina Strazov to Zilina Brodno and is costing close to €306 million to construct, with most of the funding being supplied by EU sources. This stretch of the highway is both complex and challenging as it includes a 2.2km section of tunnel as well as bridge over the the Hr
  • New bridge spanning Red River for Vietnam
    October 28, 2014
    A new 2.85km bridge is being built in Vietnam to span the Red River at Hung Ha. The Thai Ha Bridge will connect Thai Binh Province and Ha Nam Province with the Ninh Binh highway in Cau Gie Province. The link will be constructed under the build-operate-transfer model and the concession deal means that from 18th October 2016, investors will collect toll revenues from the bridge for 19 years and two months. The highway itself will feature four lanes with a maximum travel speed of 80km/h.