Skip to main content

VIDEO: Drone for Fehmarnbelt tunnel

Dane Grace, one of the world's most talented drone pilots, has flown his drone over the German and Danish construction sites for the Fehmarnbelt Tunnel, set to be the world’s longest immersed tunnel.
By David Arminas August 1, 2025 Read time: 2 mins
Ready for take-off at Puttgarden, Germany (image courtesy Femern)

In perfect weather conditions, internationally renowned drone pilot Dane Grace flew his drone over the German and Danish construction sites for the Fehmarnbelt tunnel.

On his first visit to the construction site, he was able to film the construction of the tunnel element factory on the Danish island of Lolland. Now he was back on site. His spectacular footage shows the progress of work on the tunnel portals in Germany and Denmark, as well as the production of tunnel elements in the large factory in Rødbyhavn.

The Fehmarn Belt Tunnel could open by mid-2029. Around 1,500 tonnes of reinforcement for casting the concrete tunnel elements are produced weekly for the 17.6km-long structure. Formwork specialist Peri supplied 10,000 tonnes of formwork needed for construction of tunnel elements.

The individual elements will eventually be lowered into place and connected together on the bottom of the Baltic Sea, according to the client Femern, part of the 100 per cent state-owned company Sund & Bælt. Femern is tasked with planning, building and operating the fixed link across the Fehmarnbelt between Denmark and Germany.

The two contractor consortia, Fehmarn Belt Contractors (FBC) and Fehmarn Link Contractors (FLC), are responsible for the construction of the tunnel that will run between Rødbyhavn on Lolland and Puttgarden, a ferry harbour and a village on the German island of Fehmarn.

Click here to see the video.

For more information on companies in this article

Related Content

  • Femern opts for immersed tunnel for the Fehmarn Belt link
    September 18, 2013
    The company behind the proposed Fehmarn Belt link crossing the Baltic Sea between Denmark and Germany will create the link with an immersed tunnel, despite a new environmental survey showing that a drilled tunnel would be more environment-friendly.
  • VIDEO: Companies pre-qualify for Fehmarnbelt Fixed Link consulting
    November 3, 2016
    4782 Femern, the company charged with building what will be the world’s longest submerged tunnel, has prequalified companies for consulting work.

    The companies will be able to tender for two framework agreements, one for client consulting services and the other for technical in-house consulting services.

    Femern is responsible for building the 18km Fehmarnbelt Fixed Link immersed tunnel between Rødbyhavn in Denmark and Puttgarden in Germany. The estimated cost has increased over the past several years to reach around €7.4 billion.
  • Denmark fixed link project proposed
    March 18, 2022
    A new fixed link project is proposed to span Denmark’s Kattegat strait.
  • Plans in hand for Denmark-Germany tunnel link
    January 25, 2013
    The tender pre-selection process is underway for the new tunnel link that will connect Denmark with Germany. Danish state-owned company Femern said that interest is strong in the project to build the tunnel, which will run under the Baltic Sea. So far nine consortia comprising 24 companies in all are taking part in the tender pre-selection process. The Fehmarn Belt Fixed Link will feature an immersed tunnel and its construction is expected to cost some €5.5 billion. There are four main contracts including d