Skip to main content

Vehicle emissions strategy

Environmental questions are facing the construction of the Martin-Presov highway in Slovakia. The European Investment Bank (EIB) and European Bank for Reconstruction and Development (EBRD) are waiting to receive approval to fund construction of the highway in Slovakia from the European Commission (EC). However the EC is not giving its approval for the loans at present until the Slovak Government provides answers as to why the route goes through a national park. Although the Slovakian Transport Ministry is k
July 3, 2012 Read time: 2 mins
Environmental questions are facing the construction of the Martin-Presov highway in Slovakia. The 1054 European Investment Bank (EIB) and 1166 European Bank for Reconstruction and Development (EBRD) are waiting to receive approval to fund construction of the highway in Slovakia from the 2465 European Commission (EC). However the EC is not giving its approval for the loans at present until the Slovak Government provides answers as to why the route goes through a national park. Although the Slovakian Transport Ministry is keen to sign the contracts for the project, the EC is holding back until the answers are provided. The Slovakian Transport Ministry has said that it may opt to change the route of the controversial section of the Martin- Presov highway to meet requests from the European Commission. Environmental groups have suggested building tunnels but the Transport Ministry says that this would be too expensive. The latest developments mean that the highway may not be completed by 2013 as planned.

Related Content

  • EIB lends €900mn for Poland’s S7 and S8 dual carriageways
    December 14, 2012
    Polish state-owned Bank Gospodarstwa Krajowego (BGK) has signed a €900 million loan agreement with the European Investment Bank (EIB). The money from the loan will be allocated via the National Road Fund (KFD) in the construction of S7 and S8 dual carriageways. The three-section S7 carriageway will be 90.5km long, while the four-section S8 carriageway will stretch over 301km. Both routes will be part of the Trans-European Networks (TEN) system.
  • Important road works for Slovakia
    July 6, 2023
    Important road connection works are underway for Slovakia.
  • Building New zealand's landmark tunnel
    February 15, 2012
    A landmark tunnelling project is commencing in New Zealand - Kristina Smith reports. New Zealand is preparing to embark on its biggest transport project ever. In August it announced that it had selected its preferred bidder for the NZ$1.4 billion Waterview Connection in Auckland, 5km of new motorway connecting highways to the North and South of the city.
  • Work starts on last Sofia-Kalotina section
    May 24, 2023
    Bulgaria’s A6 Europa Motorway from the capital with link up with Serbia’s A4 Motorway.