Skip to main content

US$30m flyover and underpass projects start in Pakistan

Initiatives are part of 67 road projects in city of Rawalpindi
By Liam McLoughlin July 14, 2025 Read time: 2 mins
The 67 road projects cover 607km in the city of Rawalpindi, with 51 of them having been completed. Image: © Malik Naveed/Dreamstime.com

The GPO Chowk Underpass and the Nawaz Sharif Flyover in Rawalpindi, Pakistan have been inaugurated by Maryam Nawaz Sharif, the Chief Minister of Punjab, Pakistan.

The Pakistan Observer reported that the US$30m projects include the GPO Chowk Underpass, which is expected to enable the passage of over 200,000 vehicles per day along the Mall Road-TM Chowk signal-free corridor, while the Nawaz Sharif Flyover is expected to handle more than 300,000 vehicles per day. The two projects are part of 67 road projects covering 607km in the city, with 51 of them having been completed.

Work on the Nawaz Sharif Flyover started in January and the initial cost of US$7.39m (PKR2.1bn) has increased to US$12.67m (PKR3.6bn). The construction of the GPO underpass started in February with an estimated cost of US$16.18m (PKR4.6bn).

The PMLN party, which governs Punjab, says the Nawaz Sharif Flyover, beginning at Kachehri Chowk on Adiala Road, connects to GT Road, Rawalpindi Ring Road, and Chakri Interchange on the motorway, adding it will significantly cut travel time by over an hour and reduce fuel costs for thousands of commuters.

PMLN says the surrounding areas - including Gorakhpur, Adiala, Khalsa Khurd, Khalsa Kalan, Dhallan, Jarrar Camp, Dhok Awan, and Singral - will all benefit from improved traffic flow. A 2km-long service road has also been constructed alongside the flyover for enhanced accessibility.

Meanwhile, the GPO Chowk Underpass project on Mall Road, spanning around 2km, features the city’s first intelligent traffic signal system. PMLN says the underpass will facilitate smooth access from Kashmir Road to National Highway (N-5), easing commutes to major destinations such as CMH, MH, and AFIC hospitals.

Related Content

  • Pakistan highway project now commencing
    January 5, 2018
    Construction work is starting in Pakistan on the new E-35 Highway project.
  • Vandals attack road fittings on key Nairobi road link
    April 24, 2013
    A wave of vandalism has hit a new superhighway from Nairobi as Shem Oirere reports. The newly opened 45km superhighway in Kenya’s capital Nairobi is facing a new challenge that threatens to erode its international standards and compromise the benefits it is meant to generate. A wave of vandalism targeting road fittings has hit the US$360 million highway linking Nairobi to Thika Town, posing a new challenge in the maintenance of the new road infrastructure in Kenya. The destruction delayed the completion of
  • US$97 million WB backing for Pakistan-Afghanistan expressway
    February 19, 2024
    World Bank’s US$97 million support will assist the Pakistan-Afghanistan expressway project.
  • US$557.15mn Shenzhen, China ‘longest’ tunnel works to start in 2013
    July 8, 2013
    A US$557.15 million (CNY 3.45bn) project to build Shenzhen, China’s longest tunnel will start before the end of this year. Due for completion in 2015, the 7.5km tunnel will connect Yantian District and the Pingshan New Area. The Pingyan Passage connecting the two areas will have two flyovers and three bridges, including the tunnel. An 80km/h speed limit will be imposed on the six-lane route. The $629.82 million (CNY 3.9bn) 11.3km long Pingyan Passage will shorten driving time to 10 minutes. The passage will