Skip to main content

US$2.66 billion tender for Poland’s A1 motorway will be called in mid-2013

Poland's General Directorate for National Roads and Motorways (GDDKiA) is to announce a US$2.66 billion [€2bn] tender in mid-2013 for the construction of the A1 motorway between Pyrzowice near Katowice and Tuszyn near Lodz. According to the head of GDDKiA, the tender for the 140km-long road will be divided into sections of around 20km. The Polish government has given up on its original idea of constructing the road on a PPP model, since Eurostat insisted that the cost of the project should be added to Polan
January 25, 2013 Read time: 1 min
Poland's General Directorate for National Roads and Motorways (1361 GDDKiA) is to announce a US$2.66 billion [€2bn] tender in mid-2013 for the construction of the A1 motorway between Pyrzowice near Katowice and Tuszyn near Lodz.

According to the head of GDDKiA, the tender for the 140km-long road will be divided into sections of around 20km. The Polish government has given up on its original idea of constructing the road on a PPP model, since 1615 Eurostat insisted that the cost of the project should be added to Poland's national debt and deficit. However, a special purpose company will be established by the government to take charge of the project. This firm will be able to draw on 3287 EU subsidies, and charge tolls for use of the road.

For more information on companies in this article

Related Content

  • Poland: Budimex signs Olsytyn city ring-road contract
    April 4, 2016
    Budimex has signed a contract worth more than €214.3 million for construction of the second section of Olsztyn's ring-road. The section will be around 14.7km long and will be completed within 28 months. The bid by Budimex was the fourth lowest offer in the tender, as announced by the Polish General Directorate for National Roads and Motorways (GDDKiA).
  • Poland: A1 tender attracts 11 offers, including one from Strabag
    February 19, 2015
    Construction of a 15.2km section of Poland’s A1 motorway has attracted 11 bids. A Strabag consortium made the lowest bid for the section, between Pyrzowice and Rzasawa, coming in at €146 million. A consortium formed by Polaqua and Dragados was the second lowest, at €156.4 million. The highest bid was €183.4 million. The contract calls for a construction period of 30 months. Meanwhile, the province of Mazowsze, or Masovia, with its 5.5 million inhabitants and the capital Warsaw, will get nearly €2.1 billion
  • Funds for Poland’s highways maintenance, repairs
    May 14, 2012
    Poland’s government plans to boost highways spending in 2011 with a budget of €8.72 billion, an increase of €3.73 billion over the budget set for 2010. However, there is some scepticism as to how such a substantial sum will be found, especially given the spending restrictions the country is already seeing.
  • Salini wins deal to build part of Poland’s S7 Expressway
    August 28, 2018
    Salini Impregilo has won a new contract worth about €250 million in Poland to design and build a section called Lot 3 of the S7 Expressway. Work on the four-lane 18.3km section between Widoma and Krakow will last 34 months, includes the construction of overpasses, bridges, animal crossings and a 2km viaduct. The S7 will cross Poland from Gdansk in the north to Krakow in the south. The client is the General Directorate of National Roads and Motorways (GDDKiA). Salini recently announced the sale of the plan